My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-17_PERMIT FILE - C1992081 (17)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081
>
2013-12-17_PERMIT FILE - C1992081 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:08 PM
Creation date
1/30/2014 8:49:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Permit File
Doc Date
12/17/2013
Section_Exhibit Name
Tab 23 Bonding
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pace 1 of 2 <br />SCRAPER ,TEAM WORK <br />Task description: Reph cc Topsoil from Stockpile E to TARR Stations 40 to 76 <br />Site: Hayden Gulch Loadout Permit Action: RN4 PermiuJob#: C1992081 <br />PROJECT IDENTIFICATION <br />Task #: _507 _ State: Colorado Abbreviation: None <br />Date: 1!10/2013 County: Routt Filename: C081 -507 <br />User: JLE <br />Agency or organization name: D,RMS <br />HOURLY EQUIPMENT COSTShift basis: I ner day <br />E uipment Description <br />- Scraper: Cat 637G w /push -pull <br />- Dozer. } NA <br />Support Equipment -Load Area: NA <br />-Dump Area: y NA <br />Road Maintenance -Motor Grader: CAT I4M <br />-Water Truck: I Water Tanker, 10,000 Gal. <br />Cnst RrPakdownc Srraner Wnrk Team Sunnnrt Fouinment Maintenance Equipment <br />j Scraper <br />Dozer <br />NA <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck j <br />%Utilization- machine: ? 100 <br />NA <br />NA <br />I 25 <br />25 <br />Oxcmership cost/hour: 5100.38 <br />NA <br />NA <br />NA <br />537.98 <br />$52.97 <br />Operating cost/hour: 5235.35 <br />; NA <br />NA <br />NA j S16.94 <br />529.77 j <br />Ripper op. cost/hour: NA <br />NA <br />NA <br />NA $0.00 <br />50.00 <br />Operator cost/hour: $30.02 <br />NA <br />NA <br />NA 527.55 <br />521.17 <br />Unit Subtotals: 5365.75 <br />NA <br />NA <br />NA j 582.46 <br />5103.91 <br />Number of Units: 4 <br />0 <br />0 0 1 <br />1 <br />Group Subtotals: Work: <br />SI,463.00 <br />Support: $0.00 Maint: <br />S186.37 <br />Total work team cost/hour. $1.64937 <br />tMATERIAL QUANTITIES <br />Initial volume: 3_0_,_361 _ _ CCY Swell factor: 1.000 <br />Loose volume: 20,361 LCY <br />Source of estimated volume: Seneca II -W Permit Table 21 -3 <br />Source of estimated swell factor. Cat Handbook <br />HOURLY PRODUCTION <br />Material Nvei?hu _ 7.100 Ib_s /LC:Y <br />Material description: Earth - Loa-1-11 -- - - <br />P.;.ued Payload: 0.600 pounds - -�- <br />Payload Capacity: 38.86 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: 24.00 _ LCY <br />Heaped Volume: 34.00 _ LCY <br />Avemge Vntume: 2,).0_0___ -- - — LCY <br />Aciiusted Capacity: 29.00 - -- - -- LCY <br />CIRCES Cost Estimatiag Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.