Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Phase 5 Slide Repair <br />Final Report <br />Quality Assurance Monitoring & Test Results <br />January 14, 2014 <br />LIST OF APPENDICES <br />ameO <br />Appendix A Record of Construction Drawings <br />Top of Soil Liner Fill As- builts Sheet 1 of 3 <br />High Volume Solution Collection As -built Sheet 2 of 3 <br />Phase 5 Slide Repair Geomembrane Panel As -built Sheet 3 of 3 <br />Appendix B Photographic Documentation <br />Appendix B.1 Photograph Log <br />Appendix B.2 Construction Photographs <br />Appendix C Staff Schedule for AMEC Personnel <br />Appendix D <br />Daily Reports <br />Appendix E <br />Technical Specifications <br />Appendix F <br />Surveyor's Certificate <br />Appendix G <br />Soil Liner Fill (Subgrade) Acceptance Forms <br />Appendix H <br />CQA Laboratory Test Results <br />Appendix I Geomembrane Quality Control Documents and Inventory <br />Appendix 1.1 Geomembrane Inventory Control <br />Appendix 1.2 Resumes of Installation Personnel <br />Appendix 1.3 Resin Quality Control Certificates <br />Appendix 1.4 Geomembrane Roll Quality Control Certificates <br />Appendix 1.5 Welding Rod Quality Control Certificates <br />Appendix J Geomembrane Installation Observations <br />Appendix J.1 Geomembrane Deployment Observations <br />Appendix J.2 Geomembrane Trial Seam Summaries <br />Appendix J.3 Geomembrane Fusion /Extrusion Welding Summaries <br />Appendix J.4 Geomembrane Defect/Repair Summaries <br />Appendix J.5 Geomembrane Destructive Testing Summaries <br />Appendix J.6 Geomembrane Non - Destructive Testing Summaries <br />Appendix J.7 Geomembrane Acceptance Notifications <br />Appendix K Geomembrane Conformance Test Results <br />Appendix L Tensiometer Certification <br />