My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01-17_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-01-17_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:03 PM
Creation date
1/24/2014 9:23:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
1/17/2014
Doc Name
Final Report - Quality Assurance Monitoring & Test Results Phase 5 Slide Repair
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Company <br />Phase 5 Slide Repair <br />Final Report <br />Quality Assurance Monitoring & Test Results <br />January 14, 2014 <br />LIST OF APPENDICES <br />ameO <br />Appendix A Record of Construction Drawings <br />Top of Soil Liner Fill As- builts Sheet 1 of 3 <br />High Volume Solution Collection As -built Sheet 2 of 3 <br />Phase 5 Slide Repair Geomembrane Panel As -built Sheet 3 of 3 <br />Appendix B Photographic Documentation <br />Appendix B.1 Photograph Log <br />Appendix B.2 Construction Photographs <br />Appendix C Staff Schedule for AMEC Personnel <br />Appendix D <br />Daily Reports <br />Appendix E <br />Technical Specifications <br />Appendix F <br />Surveyor's Certificate <br />Appendix G <br />Soil Liner Fill (Subgrade) Acceptance Forms <br />Appendix H <br />CQA Laboratory Test Results <br />Appendix I Geomembrane Quality Control Documents and Inventory <br />Appendix 1.1 Geomembrane Inventory Control <br />Appendix 1.2 Resumes of Installation Personnel <br />Appendix 1.3 Resin Quality Control Certificates <br />Appendix 1.4 Geomembrane Roll Quality Control Certificates <br />Appendix 1.5 Welding Rod Quality Control Certificates <br />Appendix J Geomembrane Installation Observations <br />Appendix J.1 Geomembrane Deployment Observations <br />Appendix J.2 Geomembrane Trial Seam Summaries <br />Appendix J.3 Geomembrane Fusion /Extrusion Welding Summaries <br />Appendix J.4 Geomembrane Defect/Repair Summaries <br />Appendix J.5 Geomembrane Destructive Testing Summaries <br />Appendix J.6 Geomembrane Non - Destructive Testing Summaries <br />Appendix J.7 Geomembrane Acceptance Notifications <br />Appendix K Geomembrane Conformance Test Results <br />Appendix L Tensiometer Certification <br />
The URL can be used to link to this page
Your browser does not support the video tag.