Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Phase 5 Slide Repair <br />Final Report <br />Quality Assurance Monitoring & Test Results <br />January 14, 2014 <br />LIST OF TABLES <br />Table No. Title <br />1 Summary of Earthworks Material Specifications <br />2 Summary of Weather Data <br />3 Earthworks CQA Testing Summary & Frequency <br />4 CQA Laboratory Test Summary — Drain Cover Fill <br />LIST OF FIGURES <br />Figure No. Title <br />ameO <br />1 Phase 5 Slide Repair Site Location <br />2 Phase 5 Slide Repair Certification Boundary Limit <br />3 Destructive Sample Test Codes for Dual Hot Wedge Fusion Welds <br />4 Destructive Sample Test Codes for Extrusion Welds with Leister Heat Seams <br />s:\projects \1568 cc &v -ph v slide repair cqa \11.0 certification report\cc &v roc report. docx <br />