My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01-17_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-01-17_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:03 PM
Creation date
1/24/2014 9:23:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
1/17/2014
Doc Name
Final Report - Quality Assurance Monitoring & Test Results Phase 5 Slide Repair
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Company <br />Phase 5 Slide Repair <br />Final Report ameO <br />Quality Assurance Monitoring &Test Results <br />January 14, 2014 <br />5.0 GEOSYNTHETICS QUALITY CONTROL SUBMITTALS <br />Geosynthetics quality control (QC) submittals that were reviewed by AMEC included <br />installation personnel resumes, geomembrane resin certificates, geomembrane roll <br />certificates, and welding rod certificates. AMEC's inventory control summarizing QC <br />certification received for each roll of geomembrane received for the Phase 5 Slide <br />Repair liner system is presented in Appendix 1.1. All geosynthetic material used as <br />part of the Phase 5 Slide Repair construction met project specifications. <br />5.1 Installation Personnel Resumes <br />AMEC reviewed the resumes of all ECA installation personnel to verify the installation <br />superintendent and the seaming personnel possessed sufficient experience as <br />required by the project technical specifications. Review of the installation personnel <br />resumes indicated that key personnel had sufficient experience that met or exceeded <br />project requirements. Geomembrane personnel resumes are presented in Appendix <br />1.2. <br />5.2 Geosynthetic Quality Control Documents <br />Quality Control documents submitted by ECA included resin supplier certificates, <br />geomembrane roll certificates, and welding rod certificates. AMEC reviewed the <br />submittals prior to geomembrane placement and verified the documentation was <br />complete, the material properties, and QC testing frequency required by the <br />specifications were met. <br />5.2.1 Resin Quality Control Certificates <br />LLDPE polymer raw material (resin) QC certificates were provided by the resin <br />manufacturer, Chevron Phillips Chemical Company, at a frequency of one per rail car <br />shipment. AMEC reviewed these certificates prior to geomembrane placement. All <br />geomembrane used on this project was produced from the same batch of resin. The <br />geomembrane manufacturer also performed density and melt index tests of the resin <br />supplied by Chevron Phillips Chemical Company to verify material properties prior to <br />geomembrane manufacture. The QC certificates provided by the resin manufacturer <br />are presented in Appendix 1.3. <br />5.2.2 Roll QC Certificates <br />ECA provided QC certificates (approximately one for every 8,855 square feet) for each <br />roll of LLDPE geomembrane used for the project, exceeding the required minimum <br />frequency of one per 50,000 square feet of geomembrane. AMEC reviewed the QC <br />certificates to verify conformance of the geomembrane to the project requirements. <br />Geomembrane was placed only when complete QC documentation was provided and <br />sAprojects \1568 cc &v -ph v slide repair cqa \11.0 certification report\cc &v roc report. docx 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.