Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Phase 5 Slide Repair <br />Final Report ameO <br />Quality Assurance Monitoring &Test Results <br />January 14, 2014 <br />AMEC determined that test results met or exceeded project specifications. The <br />geomembrane roll QC certificates are presented in Appendix 1.4. <br />5.2.3 Welding Rod QC Certificates <br />Welding rod certification consisted of resin QC documents for the resin used to <br />manufacture the welding material for the Phase 5 Slide Repair. The welding material <br />used on this project was produced from one batch of resin. AMEC's review of the QC <br />certification indicates that the resin used to manufacture the welding material met <br />project specifications. The welding rod QC certificates are presented in Appendix 1.5. <br />sAprojects \1568 cc &v -ph v slide repair cqa \11.0 certification report \cc &v roc report. docx 10 <br />