Table 1: Phase and Parcel Interim and Final Reclamation <br />Phase <br />Parcel <br />Acres <br />Interim Reclamation <br />Final Reclamation <br />I <br />1 <br />12 <br />Open space <br />Wetlands or u land area <br />I <br />2 <br />9 <br />Open space <br />Wetlands or upland area <br />1 <br />3 <br />25 <br />Open space <br />Wetlands or upland area <br />I <br />4 <br />96 <br />Water storage reservoir <br />excavation <br />Water storage reservoir <br />II <br />5 <br />30 <br />Open space <br />Wetlands or upland area <br />II <br />6 <br />8 <br />Overburden stockpile area <br />Reservoir bank <br />III <br />194 <br />Water storage reservoir <br />excavation <br />Water storage reservoir <br />Buffer <br />Zone <br />75 <br />Undisturbed <br />Undisturbed <br />6.4.5 Exhibit E: Reclamation Plan <br />Item 11: SSQ commits to submitting a technical revision to address the specifics <br />required for wetland or upland seed mix and reservoir bank vegetation for final <br />reclamation after completion of interim reclamation. <br />Item 12: Prior to mining, bond will be posted for interim reclamation (Table 1). For <br />Parcels 1, 2, 3 and 5, upon completion of mining, seeding and mulching, <br />notification will be made to the Division and SSQ that the parcels are ready for <br />final reclamation bond. For Parcels 4 and Phase III, upon completion of mining <br />and constructing slopes to 3H:1 V, the Division and SSQ will be notified the <br />parcels are ready for final reclamation. Parcel 6 is an overburden stockpile area <br />that will not be mined. Upon compaction and seeding, the Division will be notified <br />the parcel is ready for final reclamation. Soon after notification, SSQ will provide <br />bonding for final reclamation. The time table for the project is driven by <br />economic demand for construction material and CPW timeline. <br />Item 13: Regarding reclamation of Parcel 4 and Phase III, slopes will be constructed no <br />steeper than 3H:1V. Upon completion of slope construction, SSQ and the <br />Division will be notified with SSQ posting final reclamation bond soon thereafter. <br />In the event it is anticipated liner construction will be delayed for more than one <br />year, slopes will be vegetated and mulched in a similar fashion to Parcels 1, 2, 3 <br />and 5. <br />Item 14: SSQ commits to submitting a technical revision application to address the <br />specifics required for lined water storage as final reclamation prior to completion <br />of interim reclamation. <br />6.4.6 Exhibit F: Reclamation Plan Map <br />Item 15: Parcel acreage noted on the map is consistent with Table 1 and Exhibit C. <br />Item 16: The existing stockpile is included in Parcel 5. <br />6.4.7 Exhibit G: Water Information <br />Item 17: <br />17a: Water structures are located on Exhibit C. <br />17b: The alluvial aquifer is discussed in Blue Earth's Solutions hydrogeology report in <br />Appendix A. <br />Page 3 of 7 1107 Main Street, Canon City, CO 81212 <br />www.envalternatives.com • e -mail: eai @bresnan.net <br />Phone: 719 - 275 -8951 • Fax: 719 - 275 -1715 <br />