Laserfiche WebLink
Item 9: <br />9a: Fremont and SSQ respectfully request phased bonding for the life of the <br />mine. <br />9b: Prior to mining, bond will be posted for interim reclamation (Table 1) of the <br />area to be mined and any other area affected by mining operations. <br />Parcels 1, 2, and 3 are production and stockpile areas. The use of these <br />parcels will remain consistent through the life of the mine and they are <br />currently included in the bond. Final reclamation of these parcels will <br />commence when Phase III is mined out, no sooner than ten years from <br />the date of this correspondence. Upon removal of equipment and <br />stockpiles, SSQ will submit a third party bond for interim reclamation <br />costs to replace Fremont's bond. Within approximately 90 days of the <br />third party bond submission, SSQ will submit a request to bond for final <br />reclamation. <br />Parcel 4 of Phase 1 will be mined out within the next 90 days. Upon <br />completion of 3HAV slopes and pit floor back backfilling to three (3) feet <br />above the Pierre Shale, SSQ will post a third party bond for interim <br />reclamation to replace Fremont's bond. Within 180 days, SSQ and ASI <br />will acquire appropriate permits and approvals for final reclamation as <br />lined reservoir. Final reclamation bond will be posted during this time. <br />Parcel 5 is in queue for mining upon completion of mining in Parcel 4 of <br />Phase I, anticipated in Spring 2014. Final reclamation of this parcel is <br />backfilled concurrent with mining to a level above static groundwater to <br />vegetate as open space. Upon completion of mining and backfilling, SSQ <br />will submit a third party bond for interim reclamation to replace Fremont's <br />bond. Within 180 days, SSQ will submit a request to move to final <br />reclamation. <br />Mining of Phase III is anticipated in approximately two (2) years. Phase <br />III will proceed as Parcel 4 of Phase I mining from south to north. Slopes <br />will be constructed 3H:1V and the floor backfilled to three (3) feet above <br />the Pierre Shale concurrently with mining. Upon completion of slope and <br />floor construction, SSQ will post a third party bond for interim reclamation <br />to replace Fremont's bond. Within 180 days, SSQ and ASI will acquire <br />appropriate permits and approvals for final reclamation as lined reservoir. <br />Final reclamation bond will be posted during this time. <br />Item 10: Material will be extract to Pierre shale and backfilled to a working floor three (3) <br />feet above the shale in Parcel 4 and Phase III. Pierre shale is bedrock and <br />below groundwater elevation. Parcels 1, 2, 3 and 5 will be mined to Pierre Shale <br />and backfilled to no less than three (3) feet above prevailing groundwater <br />elevation. Survey control points exist, are maintained and will be established in <br />future parcels. <br />Er-gVilrronrgenLca11 ,\I IWrrnnaItch eS I Inn c„ <br />Page 2 of 7 1107 Main Street, Canon City, CO 81212 <br />www.envalternatives.com • e -mail: eai @bresnan.net <br />Phone: 719 - 275 -8951 • Fax: 719 - 275 -1715 <br />