My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-31_GENERAL DOCUMENTS - C1980004
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980004
>
2013-12-31_GENERAL DOCUMENTS - C1980004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 3:28:06 PM
Creation date
1/7/2014 8:24:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
General Documents
Doc Date
12/31/2013
Doc Name
Midterm Review & Cost Estimate (MT7)
From
DRMS
To
J.E. Stover & Associates
Permit Index Doc Type
Findings
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Task description: Mobilize/Demobilize Equipment for Site Maintenance <br />Site: McClane Canyon Mine Permit Action: MT7 <br />PROJECT IDENTIFICATION <br />Task #: 038 State: Colorado <br />Date: 12/31/2013 County: Garfield <br />User: ZTT <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Page 1 of 2 <br />Permit/Job #: C1980004 <br />Abbreviation: None <br />Filename: C004 -038 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON- HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities <br />0 -25 Tons <br />26 -50 Tons <br />51+ Tons <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />NON ROADABLE EQUIPMENT: <br />Machine <br />Weight/ <br />Owner ship <br />Haul Rig <br />Fleet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost/hr/ unit <br />Cost/hr /unit <br />Size <br />Cost/hr/ <br />Cost/hr/ fleet <br />Cost/ fleet <br />(TONS) <br />fleet <br />Cat D3K LGP - 3P <br />9.83 <br />$0.00 <br />$88.67 <br />10 <br />$886.70 <br />$886.70 <br />$250.00 <br />Subtotals: 1 $886.70 7 $886.70 1 $250.00 <br />ROADABLE EOUIPMENT: <br />Machine Description Total Cost/hr/ unit Fleet Size Haul Trip Return Trip <br />Cost/hr/ fleet Cost/hr/ fleet <br />Subtotals: $0.00 $0.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.