Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 037 Page 2 of 2 <br />EOUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: GRAND JUNCTION <br />Total one -way travel distance: 40.00 miles <br />Average Travel Speed: 45.00 mph <br />Total Non - Roadable Mob/Demob Cost <br />`* two round trips with haul rig: $2,302.99 <br />Total Roadable Mob/Demob Cost * * $180.73 <br />* * one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.89 <br />0.89 <br />0.89 <br />0.89 <br />0.25 <br />NA <br />0.25 <br />NA <br />2.28 <br />1.78 <br />Total job time: <br />4.56 Hours <br />Total job cost: $2,483.72 <br />CIRCES Cost Estimating Software <br />