Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 038 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one -way travel distance: <br />Average Travel Speed: <br />Total Non - Roadable Mob /Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob /Demob Cost ** <br />* * one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.89 <br />0.89 <br />0.89 <br />0.89 <br />1.50 <br />NA <br />1.50 <br />NA <br />4.78 <br />1.78 <br />Total job time <br />Page 2 of 2 <br />GRAND JUNCTION <br />40.00 miles <br />45.00 mph <br />$8,972.91 <br />$0.00 <br />9.56 Hours <br />Total job cost: $8,972.91 <br />CIRCES Cost Estimating Software <br />