Laserfiche WebLink
revised ARR section "Revegetated Land Fertilizer Rates and Pasture Yields" identifies this <br />information. In the original document, NH2 incorrectly stated that the average was "weighted ". <br />The corrected "average" is noted on Exhibit 2011 -11. <br />DRMS Item H. The soil test results are illegible and unclear in Attachment 2011-A. <br />Please provide a legible copy. (Comments 22, 23, 24) <br />WFC Response: The revised Attachment 2011 -A includes a newly formatted table, which <br />is legible. The corrections for the proper Zone are reflected in the revised document. A note was <br />added to soil type in Comment 24. On Table 2.05.4(2)(d) -1B it states in the Units section of that <br />Table "* -All except S, LS, SC, SIC, C "; therefore, S, LS, SC, SIC, C are not acceptable. <br />DRMS Item 12. Map 2.05.4 -4 from the Permit shows the required topsoil replacement <br />depths for each zone. Exhibit 2011 -6 in the ARR also shows topsoil replacement depths for <br />each zone, but it is not consistent with Map 2.05.4 -4. Please verify and accurately report the <br />replacement depth in the ARR Exhibit. (Comment 25) <br />WFC Response: Table 2.05.4(2)(d) states "Zone 4 is a 54.33 acre field that will receive 24 <br />inches of Lift A Topsoil along with 33 inches of Lift B Topsoil. Total combined topsoil <br />thickness will be 58 inches ". The total thickness is incorrect and should be 57 inches. Table <br />2.05.4(2)(d) -3 shows that Zone 4, Lift A Topsoil, Thick (in.) 24" and Lift B Topsoil, Thick (in.) <br />33 ". Therefore, the total thickness is 57 ". The original Map 2.05.4 -4 shows incorrectly 25" Lift <br />A, 33" Lift B, for a total of 58 ". Map 2.05.4 -4 should read Lift A 24 ", not 25" and Total 57 ", not <br />58 ". This correction to the Map will be addressed in a future Permit revision. <br />Page 3 of 6 <br />