Table D -2 Tomichi Pit Mining Sequence <br />The mining schedule is planned to minimize disturbance by reclaiming areas as additional <br />mining is undertaken. The table shows that mining and reclamation will occur within <br />approximately 27 years and the total sand and gravel mined will be approximately 5.3 million <br />tons. This is based on computer grids generated from the topography and the available <br />exploration data. As previously stated, the life of the operation is very dependent upon demand, <br />therefore the predicted life is only approximate. <br />3. Mine Facilities and Operation <br />The facilities on site will consist of a crusher and screener, an asphalt plant, a wash plant, a <br />concrete plant, an office, and a truck scale. Processing equipment will be located within the <br />processing area shown on Map C -2 and C -213. Map C -213 shows the processing area during most <br />of the mine's life (through Stage 2 mining) when the processing area is located nearly at natural <br />grade at the south end of Stage 1. Map C -2 shows the processing area location on the Stage 1 pit <br />bottom, during the last stage of mining, when the original processing area is mined out. Waste <br />asphalt will be stored next to the asphalt plant and will be recycled into the plant as needed. Fuel <br />for the plants will come from on board fuel tanks. A fuel farm will be constructed on site to <br />provide for mobile equipment, and all tanks will be covered by the SPCC plan for the site. <br />Tomichi Pit, December 2013 D -3 <br />Production <br />Year <br />peryear <br />Phase <br />Comments <br />Length of time to <br />complete (Yeats) <br />(tons) <br />Site preparation; access road construction, <br />1 <br />truck scale installation, pit dewatering, etc. <br />0.25 <br />Mining of deposit with concurrent reclamation. <br />1 -27 <br />200,000 <br />1 -2 <br />26.23 <br />Topsoiling of the final portions of necessary <br />27 <br />disturbed areas. Seeding of retopsoiled areas. <br />0.17 <br />Cease dewatering. <br />Total <br />26.65 <br />The mining schedule is planned to minimize disturbance by reclaiming areas as additional <br />mining is undertaken. The table shows that mining and reclamation will occur within <br />approximately 27 years and the total sand and gravel mined will be approximately 5.3 million <br />tons. This is based on computer grids generated from the topography and the available <br />exploration data. As previously stated, the life of the operation is very dependent upon demand, <br />therefore the predicted life is only approximate. <br />3. Mine Facilities and Operation <br />The facilities on site will consist of a crusher and screener, an asphalt plant, a wash plant, a <br />concrete plant, an office, and a truck scale. Processing equipment will be located within the <br />processing area shown on Map C -2 and C -213. Map C -213 shows the processing area during most <br />of the mine's life (through Stage 2 mining) when the processing area is located nearly at natural <br />grade at the south end of Stage 1. Map C -2 shows the processing area location on the Stage 1 pit <br />bottom, during the last stage of mining, when the original processing area is mined out. Waste <br />asphalt will be stored next to the asphalt plant and will be recycled into the plant as needed. Fuel <br />for the plants will come from on board fuel tanks. A fuel farm will be constructed on site to <br />provide for mobile equipment, and all tanks will be covered by the SPCC plan for the site. <br />Tomichi Pit, December 2013 D -3 <br />