Laserfiche WebLink
All observed topsoil stockpiles are marked in accordance with 4.02.7; however, two markers on <br />topsoil stockpiles near the waste disposal site have fallen and should be replaced (see photo <br />13933). <br />No disturbances to areas outside the permitted area were noted. <br />The following items were verified on file at the Foidel Creek Mine office during the records <br />check: <br />• DRMS permit: 2013 renewal #6 currently in process, has been extended (exp 9/6/13) <br />• Permit Application Package with revisions <br />• Most recent findings documents (RN -5) <br />• Insurance certificate (exp. 11/1/14) <br />• Self Bond #006 <br />• Air emissions permit (exp. 8/2014) <br />• County special use permit <br />• Subsidence monitoring reports (1St & 2nd half 1996) <br />• Rill and gully survey (10/3/2013) <br />• Annual Reclamation Report (2012) <br />• Midterm review documents (6/28/2011) <br />• Over 3 year's DRMS / OSM inspection reports (through 9/2013) <br />• Transfer / Succession of operator documents (SO -2, 6/26/2006) <br />• Reclamation cost estimate (RN -5; will be updated after permit renewal 6 approval <br />becomes final) <br />• Pond certification as- builts (Exhibit 18) <br />• Annual pond certifications: quarterly pond inspections are conducted by a P.E.; please <br />ensure reports are certified by a P.E. if being used as annual certifications <br />• Fill certifications for underground development waste: 3rd 2013 quarterly inspection <br />• Coal processing waste banks: 3rd 2013 quarterly inspection <br />• Haul & access road certifications <br />• NPDES permit (CO- 0034142 renewed 11/2012) <br />• NPDES records (1St, 2" d, and 3rd quarter 2013) <br />• 2013 Stormwater management plan <br />• SPCC plan <br />• 3rd 2013 Quarterly pond inspections <br />• Annual hydrology report (2012) <br />• Groundwater monitoring <br />• Surface water monitoring <br />• Spring and seep monitoring <br />• Mine water discharge monitoring (mine water is pumped to B -seam) <br />• Well permits <br />• Missing documents: phased bond release (SL -1), underground mining landowner <br />notifications <br />3 <br />