My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-11-27_REVISION - M1990057
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1990057
>
2013-11-27_REVISION - M1990057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:28:46 PM
Creation date
11/29/2013 10:17:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990057
IBM Index Class Name
REVISION
Doc Date
11/27/2013
Doc Name
Extension Request Amendment Review no 1
From
The Union Milling Company
To
DRMS
Type & Sequence
AM1
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix 5 -1 Reclamation Cost Estimate <br />Task 3 Cap Monitoring Wells <br />a) 2 wells each at 100ft well @ 4in dia. Approx 2.5 yd3. <br />b) Use -1 inch aggregate to fill well. Delivered aggregate cost is $35 /ton. <br />c) Use 90 -lb sacks concrete, hand mix to fill last 2 ft of wells. <br />Equipment Rates <br />Size <br />Labor <br />0 &M' <br />Op. Cost <br />Deliver aggregate and labor to complete tasks <br />2 Fill Wells with Aggregate Material <br />($/hr) <br />($/h r) <br />($/h r) <br />Haul Truck <br />26yd <br />$45.00 <br />$1.63 <br />$46.63 <br />Front -End Loader <br />3.5yd3 <br />$45.00 <br />$33.99 <br />$78.99 <br />Bulldozer <br />230hp <br />$45.00 <br />$64.73 <br />$109.73 <br />(1) 0 &M inlcudes capital recovery, overhaul, maintenance, fuel ($4.08 /gal), lube($13.18 /gal), tires, and consumable costs. <br />ATTACHMENT <br />November 22, 2013 <br />No. Task Description <br />s s Qty Prod. Hours s Rate Cost <br />(yd) (yd /hr) ( $tyd) ($) <br />Notes <br />1 Mobilize Equipment & Labor <br />Is - $1,000 <br />Deliver aggregate and labor to complete tasks <br />2 Fill Wells with Aggregate Material <br />2.5 $35.00 $88 <br />40 bag <br />3 Fill Wells with Concrete <br />Is - - $100 <br />Will be used to further neutralize tailings in TSF <br />4 <br />Copper Sulfate <br />5 bag <br />Task 3: Cap Monitoring Wellsl <br />0.0 $1,188 <br />Small quanity placed in TSF <br />Task 4 Remove On -Site Reagents <br />a) Reagents will be picked up at site by approved hazardous waste disposal company, and hauled to EPA - approved disposal facility <br />with chain -of- custody documentation. <br />b) Estimates based on actual costs incurred by UMC to removed reagents at site when the mill was purchased. <br />c) Any remaining lime will be placed in TSF for added neutralizing of tailings material. <br />d) Copper sulfate inventory- 5 bags @ 20lb/bag = 1001b - is small quanity and will be dissolved, pumped through tails thickener and placed in TSF <br />No. <br />Task Description <br />Qty Unit <br />Hours Rate <br />$ /drum <br />Cost <br />$ <br />Notes <br />1 <br />Hydrated Lime <br />40 bag <br />$0.00 <br />$0 <br />Will be used to further neutralize tailings in TSF <br />2 <br />Copper Sulfate <br />5 bag <br />$0.00 <br />$0 <br />Small quanity placed in TSF <br />2 <br />Xanthate <br />2.0 drum <br />$600.00 <br />$1,200 <br />$400/st- delivered price. <br />3 <br />Pine Oil <br />2.0 drum <br />$600.00 <br />$1,200 <br />Pumping cost. <br />4 <br />Flocculent <br />1 1.0 drum <br />$600.00 <br />$600 <br />2 personnel each @ $25 /hr <br />6 <br />Task 4: Remove On -Site Reagentsl Reagents <br />00 <br />$3,000 <br />Task 5 Process Remaining RoM Material <br />a) Assume plant is at full capacity at time of reclamation. Dry material total 35t coarse ore bin, 100t fine ore bin =135t total material. <br />b) Operating costs based on UMC's Technical- Economic Model at 75t/d (3.75t/h @ 20hr /day) <br />c) All material and water in ball mill, conditioning tank, float cells and thickeners will be pumped out at same cost as dry material. <br />Material will be run through ball mill, then routed through float cells and to tailings thickener before reporting to TSF. <br />d) Lime will be added at ball mill to neutralize material. Metallurgical testwork on Cross Mine ore indicates 3.4kg of lime [Ca(OH)21 is required to bring <br />pH to 9.0. For purpose of this estimate, assume 2X this amount will be required. 6.8kg /tonne = 13.6lb /st = 0.007st lime per st -ore. Given 135 st <br />of ore must be treated, then: 0.007st- lime /st -ore x 135st -ore = 0.945st- lime is required. Assume 1 st lime will be required. <br />d) Process water (see Figure 4 -11) 3,900gal will be pumped through float cells and concentrate and tailings thickener to TSF. Reagents in the system <br />will also be pumped out with the process water. This will dilute the reagents and flush out the process system. Reagent amount in the system is minir <br />and will have di minimus affect on tailings chemistry in the TSF. <br />e) Fresh water (see Figure 4 -11) 10,600gal will be drained into sewer system via gravity. <br />No. <br />Task Description <br />Qty Unit <br />Hours Rate <br />$/ton <br />Cost <br />$ <br />Notes <br />1 <br />Crush Coarse Ore <br />35 tons <br />$4.11 <br />$144 <br />Based on UMC Technical Model <br />2 <br />Grind Coarse Ore and Fine Ore <br />135 tons <br />$2.62 <br />$354 <br />$4.72 basis without recirculating load factor, t.s <br />3 <br />Neutralize material with Lime <br />1 ton <br />$400.00 <br />$400 <br />$400/st- delivered price. <br />4 <br />Flush System with process water <br />135 tons <br />$0.25 <br />$34 <br />Pumping cost. <br />5 <br />Labor (2 personnel) <br />- - <br />36.0 $50.00 <br />$1,800 <br />2 personnel each @ $25 /hr <br />6 <br />Task 5: Process Remaining RoM <br />36.0 <br />$2,732 <br />RECLAMATION COST ESTIMATE <br />Union Milling Company, LLC 3 of 6 <br />Mill ReclamationCost 005nm -a <br />
The URL can be used to link to this page
Your browser does not support the video tag.