My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-11-27_REVISION - M1990057
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1990057
>
2013-11-27_REVISION - M1990057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:28:46 PM
Creation date
11/29/2013 10:17:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990057
IBM Index Class Name
REVISION
Doc Date
11/27/2013
Doc Name
Extension Request Amendment Review no 1
From
The Union Milling Company
To
DRMS
Type & Sequence
AM1
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix 5 -1 Reclamation Cost Estimate <br />Task 6 Remove Mill Equipment <br />a) Remove all mill equipment from site. Equipment is salvaged, sent to recycle yard 1 mile west of property on Highway 24. <br />b) Building /structure will remain for post - milling industrial use. <br />c) Assumes all equipment is salvage. Most equipment will, however, have economic value. <br />Equipment Rates <br />Size <br />Labor <br />0 &M1 <br />Op. Cost <br />Electric <br />Other <br />($/h r) <br />($ /hr) <br />($/hr) <br />All Demolition Labor <br />$25.00 <br />($/hr) <br />$ <br />Tractor /Lowboy <br />50t <br />Notes <br />$58.97 <br />$83.97 <br />Crane <br />50t <br />$67.97 <br />$92.97 <br />$25.00 <br />(1) 0 &M inlcudes capital recovery, overhaul, maintenance, fuel ($4.08 /gal), lube($13.18 /gal), tires, and consumable costs. <br />ATTACHMENT <br />November 22, 2013 <br />RECLAMATION COST ESTIMATE <br />Union Milling Company, LLC 4 of 6 <br />Mill ReclamationCost 005nm -a <br />Unit <br />Unit <br />Electric <br />Other <br />Cost <br />No. <br />Task Description <br />hrs ) <br />($/hr) <br />$ <br />$ <br />$ <br />Notes <br />1 <br />Coarse Ore Bin & Grizzly <br />Demolition Labor <br />40 <br />$25.00 <br />$0.00 <br />$0.00 <br />$1,000 <br />Crane <br />4 <br />$92.97 <br />$0.00 <br />$0.00 <br />$372 <br />Tractor/Lowboy <br />3 <br />$83.97 <br />$0.00 <br />$0.00 <br />$252 <br />$1,624 <br />2 <br />Crusher <br />Demolition Labor <br />10 <br />$25.00 <br />$100.00 <br />$0.00 <br />$350 <br />Crane <br />5 <br />$92.97 <br />$0.00 <br />$0.00 <br />$465 <br />Tractor/Lowboy <br />6 <br />$83.97 <br />$0.00 <br />$0.00 <br />$504$1,319 <br />3 <br />Conveyors (1 Bucket & 5 Belt Units) <br />Demolition Labor <br />20 <br />$25.00 <br />$200.00 <br />$0.00 <br />$700 <br />Crane <br />5 <br />$92.97 <br />$0.00 <br />$0.00 <br />$465 <br />Tractor/Lowboy <br />6 <br />$83.97 <br />$0.00 <br />$0.00 <br />$504 <br />$1,669 <br />4 <br />Fine Ore Bin <br />Demolition Labor <br />40 <br />$25.00 <br />$200.00 <br />$200.00 <br />$1,400 <br />other cost is torch cutting. <br />Crane <br />5 <br />$92.97 <br />$0.00 <br />$0.00 <br />$465 <br />Tractor/Lowboy <br />6 <br />$83.97 <br />$0.00 <br />$0.00 <br />$504 <br />$2,369 <br />5 <br />Ball Mill <br />Demolition Labor <br />20 <br />$25.00 <br />$500.00 <br />$0.00 <br />$1,000 <br />Crane <br />5 <br />$92.97 <br />$0.00 <br />$0.00 <br />$465 <br />Tractor/Lowboy <br />6 <br />$83.97 <br />$0.00 <br />$0.00 <br />$504$1,969 <br />6 <br />Dust Collector & Ductwork <br />Demolition Labor <br />10 <br />$25.00 <br />$100.00 <br />$0.00 <br />$350 <br />Crane <br />3 <br />$92.97 <br />$0.00 <br />$0.00 <br />$279 <br />Tractor/Lowboy <br />6 <br />$83.97 <br />$0.00 <br />$0.00 <br />$504 <br />$1,133 <br />7 <br />Water Storage Tanks <br />Demolition Labor <br />6 <br />$25.00 <br />$0.00 <br />$0.00 <br />$150 <br />Crane <br />4 <br />$92.97 <br />$0.00 <br />$0.00 <br />$372 <br />Tractor/Lowboy <br />6 <br />$83.97 <br />$0.00 <br />$0.00 <br />$504 <br />$1,026 <br />8 <br />Hydrocylcones <br />Demolition Labor <br />2 <br />$25.00 <br />$50.00 <br />$0.00 <br />$100 <br />Crane <br />0.5 <br />$92.97 <br />$0.00 <br />$0.00 <br />$46 <br />Tractor/Lowboy <br />6 <br />$83.97 <br />$0.00 <br />$0.00 <br />$504 <br />$650 <br />9 <br />Conditioning Tank <br />Demolition Labor <br />1 <br />$25.00 <br />$50.00 <br />$0.00 <br />$75 <br />Crane <br />0.5 <br />$92.97 <br />$0.00 <br />$0.00 <br />$46 <br />Tractor/Lowboy <br />3 <br />$83.97 <br />$0.00 <br />$0.00 <br />$252 <br />$373 <br />10 <br />Gravity Circuit (Concentrator & Table) <br />Demolition Labor <br />2 <br />$25.00 <br />$50.00 <br />$0.00 <br />$100 <br />Crane <br />0.5 <br />$92.97 <br />$0.00 <br />$0.00 <br />$46 <br />Tractor/Lowboy <br />3 <br />$83.97 <br />$0.00 <br />$0.00 <br />$252 <br />$398 <br />11 <br />Flotation Cells <br />Demolition Labor <br />6 <br />$25.00 <br />$100.00 <br />$0.00 <br />$250 <br />Crane <br />2 <br />$92.97 <br />$0.00 <br />$0.00 <br />$186 <br />Tractor /Lowboy <br />6 <br />$83.97 <br />$0.00 <br />$0.00 <br />$504$940 <br />RECLAMATION COST ESTIMATE <br />Union Milling Company, LLC 4 of 6 <br />Mill ReclamationCost 005nm -a <br />
The URL can be used to link to this page
Your browser does not support the video tag.