Laserfiche WebLink
Appendix 5 -1 Reclamation Cost Estimate <br />Task 1 Reclaim Tailings Storage Facility. <br />a) See Figures 6 -3 and 6 -4 in Permit Application. <br />b) Estimates based on productivity indecies and work performed by contractors to construct TSF emabankment in 2011. <br />c) Costs escalated to 40 2013. <br />d) Area of TSF surface area is 109,207ft2. 2.51 acres. <br />e) Topsoil required at 4" thickness is 1,348yd3. <br />f) Seed mix requirement 18.9lbs /acre. Cost $380 /acre per Arkansas Valley Feed & Seed. <br />g) Mulch applied at rate of tons /acre at cost of $205 /acre. Estimate for straw delivered. <br />h) Apply mulch and crimp using agricultural implement. <br />Equipment Rates <br />Size <br />Labor <br />0 &M' <br />Op. Cost <br />Rate <br />($/hr) <br />Cost <br />($) <br />($/hr) <br />($/hr) <br />($ /hr) <br />Haul Truck <br />26yd <br />$45.00 <br />$1.63 <br />$46.63 <br />Front -End Loader <br />3.5yd3 <br />$45.00 <br />$33.99 <br />$78.99 <br />Bulldozer <br />230hp <br />$45.00 <br />$64.73 <br />$109.73 <br />A ricultural Tractor <br />I 90h <br />$45.001 <br />$24.971 <br />$69.97 <br />(1) 0 &M inlcudes capital recovery, overhaul, maintenance, fuel ($4.08 /gal), lube($13.18 /gal), tires, and consumable costs. <br />ATTACHMENT 6 <br />November 22, 2013 <br />No. <br />Task Description <br />Oty <br />(yd) <br />Prod. <br />(yd /hr) <br />Hours <br />Rate <br />($/hr) <br />Cost <br />($) <br />Notes <br />1 <br />Grade Embankment (Dozer) <br />3,570 <br />60 <br />59.5 <br />$109.73 <br />$6,529 <br />Grade embankment to cover tailings and establish <br />2 <br />Move SPGM to TSF (FEL) <br />700 <br />36 <br />19.4 <br />$78.99 <br />$1,536 <br />- <br />3 <br />LoadTopsoil @ Stockpile (FEL) <br />648 <br />30 <br />21.6 <br />$78.99 <br />$1,706 <br />- <br />4 <br />Haul Topsoil to TSF (Truck) <br />648 <br />30 <br />21.6 <br />$46.63 <br />$1,007 <br />Truck productivity is loader limited <br />5 <br />Spread Topsoil <br />1,348 <br />30 <br />44.9 <br />$109.73 <br />$4,931 <br />Average thickness of 4 inches <br />6 <br />Remove & Dispose of Silt Fence <br />Is <br />- <br />- <br />$45.00 <br />$1,000 <br />Estimate <br />7 <br />Seed Mix (Acres) <br />2.51 ac <br />- <br />$380.00 <br />$954 <br />Seed cost expressed in $ /acre <br />8 <br />Broadcast Seed <br />0.85 ac <br />8 <br />$45.00 <br />$360 <br />Broadcast manually with hand spreader <br />9 <br />Mulch seeded area <br />2.51 ac <br />- <br />$205.00 <br />$515 <br />Mulch cost expressed in $ /acre <br />10 <br />Apply and crimp mulch <br />2.51 ac <br />8 <br />$69.97 <br />$560 <br />Task 1: Reclaim TSFJ <br />183.1 <br />$19,097 <br />Task 2 Reclaim Low -Grade Stockpile Areas <br />a) See Figures 6 -3 and 6 -4 in Permit Application. <br />b) Estimates based on productivity indecies and work performed by contractors to construct TSF emabankment in 2011. <br />c) Costs escalated to 40 2013. <br />d) Estimate is for all 3 low -grade stockpile areas as shown in Figure 6 -2. <br />e) Assume approximately 0.85 acres of disturbacnce and 4 inch depth of soil is contaminated. Low -Grade Area 1 (LG1) = 0.35 ac <br />LG2= 0.25ac. LG3= 0.25Ac. <br />f) Seed mix requirement 18.9lbs /acre. Cost $380 /acre per Arkansas Valley Feed & Seed. <br />g) Mulch applied at rate of tons /acre at cost of $205 /acre. Estimate for straw delivered. <br />h) Apply mulch and crimp using agricultural implement. <br />Equipment Rates <br />Size <br />Labor <br />0 &M' <br />Op. Cost <br />Rate <br />(fir) <br />Cost <br />($) <br />($/hr) <br />($/h r) <br />($/hr) <br />Haul Truck <br />26yd <br />$45.00 <br />$1.63 <br />$46.63 <br />Front -End Loader <br />3.5yds <br />$45.00 <br />$33.99 <br />$78.99 <br />Bulldozer <br />230hp <br />$45.00 <br />$64.73 <br />$109.73 <br />A ricultural Tractor <br />I 90h <br />$45.001 <br />$24.971 <br />$69.97 <br />(1) 0 &M inlcudes capital recovery, overhaul, maintenance, fuel ($4.08 /gal), lube($13.18 /gal), tires, and consumable costs. <br />No. <br />Task Description <br />Oty <br />d3 <br />Prod. <br />(yd/hr) <br />Hours <br />Rate <br />(fir) <br />Cost <br />($) <br />Notes <br />1 <br />Load Contaminated Soil (FEL) <br />400 <br />40 <br />10.0 <br />$78.99 <br />$790 <br />Estimate of contaminated soil <br />2 <br />Haul Contaminated Soil into TSF (Truck) <br />400 <br />40 <br />10.0 <br />$46.63 <br />$466 <br />Truck productivity is loader limited <br />3 <br />Grade Areas (Dozer) <br />250 <br />60 <br />4.2 <br />$109.73 <br />$457 <br />4 <br />Remove & Dispose of Silt Fence <br />Is <br />- <br />- <br />- <br />$750 <br />Estimate <br />5 <br />Seed Mix <br />0.85 ac <br />- <br />$380.00 <br />$323 <br />Seed cost expressed in $ /acre <br />6 <br />Broadcast Seed <br />4 <br />$45.00 <br />$180 <br />Broadcast manually with hand spreader <br />7 <br />Mulch seeded area <br />0.85 ac <br />- <br />$205.00 <br />$174 <br />Mulch cost expressed in $ /acre <br />8 <br />Apply and crimp mulch <br />0.85 ac <br />2 <br />$69.97 <br />$140 <br />Task 2: Reclaim Low -Grade Stockpiles <br />30.2 <br />$3,281 <br />RECLAMATION COST ESTIMATE <br />Union Milling Company, LLC 2 of 6 <br />MillReclamationCost 005nm -a <br />