October 24,2013 C-1981-010/Trapper Mine JLE <br /> measured at each sample point is generally consistent throughout the site. A surveyed elevation point is located <br /> near the water tanks adjacent to the mine office. The elevation at this point is measured with the GPS and the <br /> difference of that measurement from the know elevation is used as a correction factor. During this inspection the <br /> correction factor was 56.2 feet,meaning 56.2 feet was added to each of the GPS measured elevations found at <br /> each sample point. Using Microsoft Excel®,the Division can chart the PMT map elevations, SL15 map <br /> elevations and the measured elevations to create cross-sections from the transects for each reclamation parcel for <br /> an easy comparison. <br /> During this inspection the Division walked 8 transects;maps are enclosed with this report that depict the location <br /> of each of these transects and the elevation sample points. Attachment A of this report is a summary table of the <br /> elevation data collected out in the field and the elevations interpolated at each sample point from the maps <br /> discussed above. Attachment A also contains the cross-section created from each transect. Below is a discussion <br /> of these results. <br /> For all of the elevation sample points measured out in the field,the elevations measured with the GPS unit were on <br /> average 16.5 feet higher than the elevations interpolated from the PMT map and 14.4 feet higher than the <br /> elevations interpolated from the SL15 bond release maps. <br /> Parcel A-B-13 was observed during the inspection. Several rills have begun to form on the eastern side of the <br /> parcel that should be monitored. Overall this parcel has a north eastern aspect and blends in well with the adjacent <br /> Phase III release area and adjacent graded areas. Large slumps or slides were not observed. Transects 1 and 2 fell <br /> within this parcel. For Transect 1,based on the elevation samples points,the elevations interpolated from the <br /> SL15 map were on average 1.6 feet lower than the approved post mine topography elevations interpolated from <br /> the PMT map. The measured elevations appeared to be on average 20.9 feet higher than the elevations <br /> interpolated from PMT map. The cross-section derived from the SL15 map elevations and the PMT map <br /> elevations are nearly indistinguishable. Transect 2 measured 4 sample points within this parcel. The elevations <br /> interpolated from these sample points from the SL15 map and the PMT map are almost the exact same. The <br /> measured elevations points were on average 9.21 feet higher than the approved post mine topography. All of the <br /> cross-section lines from Transect 2 are similar in grade and slope. Sample point B of transect 1 appears higher <br /> than the elevations derived from the PMT map and the SL15 map. The Division may need to re-sample this <br /> transect and or re-evaluate this portion of the parcel. <br /> Parcel Z-A-13 was evaluated with Transects 3,4, 5 and 6. This is a large undulating parcel with varying aspects <br /> and slopes. Several larger rills and gullies were observed along the transects. The Division marked the general <br /> location of the features using the GPS unit and they are depicted on the enclosed maps. Large slumps and slope <br /> failures were not observed. Transect 3 is located on the western end of the parcel. On average,the elevations <br /> interpolated at the sample points along this transect from the SL15 map were about.5 feet higher than the <br /> elevations interpolated from the PMT map. The measured elevation at the sample points along this transect was <br /> about 21 feet higher on average than the elevations interpolated from the SL15 map and the PMT map. Transect 4 <br /> is also on the western portion of this parcel. The difference in the elevations interpolated from the SL 15 map and <br /> the PMT map at the sample points along this transect are negligible. The measured elevations were on average <br /> about 10 feet higher than the elevations interpolated from the SL15 and PMT map. Transect 5 is on the eastern <br /> Number of Partial Inspection this Fiscal Year: 3 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 3 of 8 <br />