My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-28_REPORT - C1981012
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981012
>
2013-10-28_REPORT - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:34:32 PM
Creation date
10/28/2013 1:33:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REPORT
Doc Date
10/28/2013
Doc Name
2012 Annual Hydrology Monitoring Report
From
New Elk Coal Company
To
DRMS
Annual Report Year
2012
Permit Index Doc Type
Hydrology Report
Email Name
LDS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 2012 Page 1 -6 <br />All sediment ponds and direct discharge points are permitted under NPDES Permits <br />CO- 0000906. Sampling stations for this permit are described below. <br />NE -001 is a grab sample station from the New Elk Mine water discharge V -notch flume <br />located on the Purgatoire River for NPDES Discharge Permit CO- 0000906. The station <br />monitors the quality and quantity of mine water discharge from the New Elk Mine. During the <br />third quarter of 1989, the mine was sealed and the discharge of mine inflow water was <br />terminated until pumping resumed in December of 2008. <br />Table 1 -2. Water Quality Parameter Sample Suites for New Elk Mine <br />Field Measurements NPDES Biomonitorin <br />Flow rate /water level depth <br />Frequency and parameters in accordance with NPDES Permit <br />H (S.U.) <br />Conductivity (umhos) <br />Temperature <br />Sediment Pond NPDES List <br />Frequency and parameters in accordance with NPDES Permit <br />Short List <br />Sodium Adsorption Ratio (SAR) <br />Total Suspended Solids (TSS) (m 1)2 <br />Sewage Treatment <br />Total Dissolves Solids (TDS ) (m 1) <br />Frequency and parameters in accordance with NPDES Permit <br />Carbonate (m g/1) <br />Bicarbonate (m 1) <br />Chloride (m 1) <br />NE -080 PRS -4 <br />Sulfate (m 1) <br />Frequency and parameters in accordance with NPDES Permit <br />Manganese (Mn) (m 1) total, dissolved <br />Calcium (Ca) (m 1) <br />Magnesium (Mg) (m 1) <br />Potassium (K) (m 1) <br />Sodium (Na) (m 1) <br />Iron (Fe) (m 1) total, dissolved, total recoverable <br />Hardness (calculated) <br />From Table 28, New Elk Permit C- 1981 -012 <br />2 Surface water only <br />NE- 001 -G: NE -001 -G is a site under NPDES Permit No. COG - 310069. This site was <br />used to discharge water from remedial activities at the UST facilities area. NE -001 -G was <br />sampled at its outfall prior to discharging into ditch D -16, which flows into Pond NE007, a site <br />monitored under NPDES CO- 0000906. This site was eliminated during 1999 with reclamation <br />of the remediation systems and termination of Permit COG - 310069 was approved by CDPHE. <br />NE -004: A grab sample station of the discharge from the primary spillway of sediment <br />Pond 004. This site predominantly handles stormwater runoff from the New Elk underground <br />development waste pile. <br />
The URL can be used to link to this page
Your browser does not support the video tag.