Laserfiche WebLink
October 2012 <br />Page 1 -5 <br />Table 1 -1. Hydrologic Monitoring Requirements for New Elk Mine <br />Site <br />Water Level <br />or Flow <br />Field <br />Measurements <br />Laboratory <br />Analysis <br />NPDES List <br />PRS -1 <br />S <br />S <br />A <br />Q <br />PRS -4 (aka NE 080) <br />S <br />S <br />A <br />Q <br />TH -201 <br />Q <br />Q <br />Q <br />NM -21 <br />TH -202 <br />Q <br />Q <br />NM 22 <br />Q <br />TH -203 <br />Q <br />NM 23 <br />Q <br />Q <br />PAW -1 <br />S <br />S <br />A <br />Q <br />PAW -2 <br />S <br />S <br />A <br />PAW -8 <br />S <br />S <br />A <br />PAW -9 <br />S <br />S <br />A <br />NEW -2 <br />S <br />A <br />A <br />NEW -3 <br />S <br />NEW -4 <br />S <br />A <br />A <br />NPDES Stations <br />+ <br />+ <br />NE -001 (Mine water) <br />+ <br />+ <br />NE -004 (Pond 4) <br />+ <br />+ <br />NE -007 (Pond 7) <br />+ <br />+ <br />NE -008 (Pond 8) <br />+ <br />+ <br />NE -080 (PRS -4) <br />+ <br />+ <br />KEY <br />S= Semi- annually (second and fourth quarters) <br />A= Annually (fourth quarter) <br />Q= Quarterl (quarterly refuse pile inspections) <br />+ =See NPDES Permit for frequency and required analysis <br />The final approval of PR -02 occurred on September 27, 2011. PR -02 added the <br />following eight bedrock monitoring wells to the hydrologic monitoring requirements for the <br />mine. NECC did not monitor the eight wells during 2012. NECC plans to initiate monitoring of <br />the wells during the first quarter of 2013. <br />Site <br />Water Level or <br />Flow <br />Field <br />Measurements <br />Laboratory <br />Analysis <br />NE -1 -10 Allen <br />Q <br />Q <br />Q <br />NE -6 -10a Apache <br />Q <br />Q <br />Q <br />NE -6 -1 Ob Blue <br />Q <br />Q <br />Q <br />NM -20 <br />Q <br />Q <br />Q <br />NM -21 <br />Q <br />Q <br />Q <br />NM 22 <br />Q <br />Q <br />Q <br />NM 23 <br />Q <br />Q <br />Q <br />SF -2 <br />Q <br />Q <br />Q <br />1.2.3 Ponds and Direct Discharges <br />