My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-28_REPORT - C1981012
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981012
>
2013-10-28_REPORT - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:34:32 PM
Creation date
10/28/2013 1:33:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REPORT
Doc Date
10/28/2013
Doc Name
2012 Annual Hydrology Monitoring Report
From
New Elk Coal Company
To
DRMS
Annual Report Year
2012
Permit Index Doc Type
Hydrology Report
Email Name
LDS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 2012 <br />Page 1 -5 <br />Table 1 -1. Hydrologic Monitoring Requirements for New Elk Mine <br />Site <br />Water Level <br />or Flow <br />Field <br />Measurements <br />Laboratory <br />Analysis <br />NPDES List <br />PRS -1 <br />S <br />S <br />A <br />Q <br />PRS -4 (aka NE 080) <br />S <br />S <br />A <br />Q <br />TH -201 <br />Q <br />Q <br />Q <br />NM -21 <br />TH -202 <br />Q <br />Q <br />NM 22 <br />Q <br />TH -203 <br />Q <br />NM 23 <br />Q <br />Q <br />PAW -1 <br />S <br />S <br />A <br />Q <br />PAW -2 <br />S <br />S <br />A <br />PAW -8 <br />S <br />S <br />A <br />PAW -9 <br />S <br />S <br />A <br />NEW -2 <br />S <br />A <br />A <br />NEW -3 <br />S <br />NEW -4 <br />S <br />A <br />A <br />NPDES Stations <br />+ <br />+ <br />NE -001 (Mine water) <br />+ <br />+ <br />NE -004 (Pond 4) <br />+ <br />+ <br />NE -007 (Pond 7) <br />+ <br />+ <br />NE -008 (Pond 8) <br />+ <br />+ <br />NE -080 (PRS -4) <br />+ <br />+ <br />KEY <br />S= Semi- annually (second and fourth quarters) <br />A= Annually (fourth quarter) <br />Q= Quarterl (quarterly refuse pile inspections) <br />+ =See NPDES Permit for frequency and required analysis <br />The final approval of PR -02 occurred on September 27, 2011. PR -02 added the <br />following eight bedrock monitoring wells to the hydrologic monitoring requirements for the <br />mine. NECC did not monitor the eight wells during 2012. NECC plans to initiate monitoring of <br />the wells during the first quarter of 2013. <br />Site <br />Water Level or <br />Flow <br />Field <br />Measurements <br />Laboratory <br />Analysis <br />NE -1 -10 Allen <br />Q <br />Q <br />Q <br />NE -6 -10a Apache <br />Q <br />Q <br />Q <br />NE -6 -1 Ob Blue <br />Q <br />Q <br />Q <br />NM -20 <br />Q <br />Q <br />Q <br />NM -21 <br />Q <br />Q <br />Q <br />NM 22 <br />Q <br />Q <br />Q <br />NM 23 <br />Q <br />Q <br />Q <br />SF -2 <br />Q <br />Q <br />Q <br />1.2.3 Ponds and Direct Discharges <br />
The URL can be used to link to this page
Your browser does not support the video tag.