Laserfiche WebLink
o The filter building has filter presses for dewatering the fine tailings prior to disposal. <br />• Switch Gear Building <br />• 25' wide x 30' long x 17' high "at peak" <br />• Rat Slab and Monolithic /Grade Beam Foundation <br />• Rat Slab: up to 5' thick to bedrock <br />• Monolithic Slab: Grade beam: 18 "w x 30 "d <br />■ Slab: 8" thick <br />o RCM50 Rustable metal siding and roofing <br />o No heat source <br />• R -Max Rigid Foam Board and Spray Foam Insulation <br />• The switch gear building has the transformers and switch gear that are used to <br />supply the voltage needed for all site uses <br />• Battery Charging Building <br />0 45' wide x 120' long x 24' tall "at peak" <br />o Micropyle, Footer and Slab Foundation "dimensions TBW <br />o RCM50 Rustable metal siding and roofing <br />• In -Floor Radiant, Forced Air and Baseboard heating <br />• Spray Foam Insulation <br />The Filter Building is the location where the tailings are dewatered prior to exiting the building for <br />permanent disposal in the tailings /waste rock piles. The water is recycled in the mill. Large filter <br />presses will be installed in this building and will be removed for reclamation. The filters and <br />associated piping will need to be removed for reclamation. This cost is included. <br />The Switch Gear Building houses the transformers and switch gear that provide the proper voltage <br />for all the electrical uses on site. Since the dry building, battery building and filter building will <br />remain and will need heat and lights, the switch gear building should remain to provide this power <br />from the electric pole on site. <br />Revenue Mine September 2013 L -3 <br />