My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-08_REVISION - M2012032 (13)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2013-10-08_REVISION - M2012032 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:51:45 PM
Creation date
10/22/2013 8:47:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
REVISION
Doc Date
10/8/2013
Doc Name
Second Adequacy Response TR01
From
Greg Lewicki and Associates
To
DRMS
Type & Sequence
TR1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o The filter building has filter presses for dewatering the fine tailings prior to disposal. <br />• Switch Gear Building <br />• 25' wide x 30' long x 17' high "at peak" <br />• Rat Slab and Monolithic /Grade Beam Foundation <br />• Rat Slab: up to 5' thick to bedrock <br />• Monolithic Slab: Grade beam: 18 "w x 30 "d <br />■ Slab: 8" thick <br />o RCM50 Rustable metal siding and roofing <br />o No heat source <br />• R -Max Rigid Foam Board and Spray Foam Insulation <br />• The switch gear building has the transformers and switch gear that are used to <br />supply the voltage needed for all site uses <br />• Battery Charging Building <br />0 45' wide x 120' long x 24' tall "at peak" <br />o Micropyle, Footer and Slab Foundation "dimensions TBW <br />o RCM50 Rustable metal siding and roofing <br />• In -Floor Radiant, Forced Air and Baseboard heating <br />• Spray Foam Insulation <br />The Filter Building is the location where the tailings are dewatered prior to exiting the building for <br />permanent disposal in the tailings /waste rock piles. The water is recycled in the mill. Large filter <br />presses will be installed in this building and will be removed for reclamation. The filters and <br />associated piping will need to be removed for reclamation. This cost is included. <br />The Switch Gear Building houses the transformers and switch gear that provide the proper voltage <br />for all the electrical uses on site. Since the dry building, battery building and filter building will <br />remain and will need heat and lights, the switch gear building should remain to provide this power <br />from the electric pole on site. <br />Revenue Mine September 2013 L -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.