Laserfiche WebLink
• The access road and its associated gabion retaining wall will remain for site access after <br />reclamation. <br />Since the reclamation plan does not call for the removal of all surface facilities, and the Atlas <br />waste area will not have been developed yet, related reclamation will not be necessary. A detailed <br />breakdown of each task and its associated cost is shown in Table L -1. <br />Details of main building construction details built as of September 2013 are shown below: <br />• Dry Room Building <br />• 47' wide x 50' long x 28' tall "at peak" <br />• Monolithic slab w/ pre footer. Grade Beam: 16" wide x 18" deep, Slab is 6" thick <br />• RCM50 Rustable metal siding and roofing <br />• In -Floor Radiant and Baseboard heating <br />• Spray Foam Insulation <br />• Propane Boiler Heat <br />• The Dry room and office has showers, lockers, toilets, sinks, offices on the second <br />floor <br />• Filter Building <br />• 56' wide x 92' long x 35' tall "at peak" <br />• Rat slab to bedrock, Micropyles under columns, Footers, 12' Walls and Slab <br />• Rat slab: up to 5' of concrete over bedrock — one row of #5 rebar <br />• Footers: 24x36" footers <br />• Walls: 18" thick by 12' tall <br />• Slab: 8" thick <br />• RCM50 Rustable metal siding and roofing <br />• In -Floor Radiant and Baseboard heating <br />• Spray Foam Insulation <br />• Propane Boiler Heat <br />Revenue Mine September 2013 L -2 <br />