Laserfiche WebLink
Z <br />0 <br />J <br />0 <br />J <br />11 <br />\ \ 1 \ \ \ \\ \ \\ 1 20' OFF <br />o ° <br />COUNTY <br />!! 1 1 1 1 1 1 1 1 I ROAD 13 <br />/1 I II +I 1 1 1 1 fl l <br />11 1 1 IIIIIIII I !ll � °^ <br />I,���111I I I!� I 1 I 111 Ott f�/ <br />11111 � 1 � 1 � I II 11 11 III <br />1111111 I I I I 1 1 I ►I� // <br />111111111 I I I 1 1 1 ►( ! <br />!Il I I 1 <br />1111l1� j; 1+ I 1 � i III l; <br />11! 1 1 1 1 1 ! I I I I I 111 1 Joao <br />(III I 1 1 1 1 1 + 1 1 1 <br />I l i li 11 � 11 1i 1 II I I' � I I <br />I <br />11 11111111111 I I I I 1 III 1 i <br />I ! <br />I I 11 1 1 I I ! <br />Il1i11111i11111 + 111!1 I! <br />/ <br />/ <br />/ <br />/ <br />/ <br />/ <br />/ I <br />' If <br />moo / <br />/ <br />Y <br />/moo <br />/ <br />/ <br />gy / <br />MINING HIGHWALL <br />zF <br />z � <br />HISTORIC GROUND <br />NORTH <br />3, <br />1 TOP SOIL <br />1 j <br />I <br />/ <br />/ <br />/ <br />/ <br />/ <br />/ <br />/ I <br />' If <br />moo / <br />/ <br />Y <br />/moo <br />/ <br />/ <br />gy / <br />3. As topsoil and waste rock / overburden are removed from <br />active mining areas, it will be used to create reclaimed slopes <br />and to cover the pit floor in previously mined out areas. <br />4. Final reclaimed slopes shall be 3H: 1 V or flatter. <br />5. Topsoil and waste rock / overburden not immediately used for <br />reclamation will be stockpiled on the pit floor. <br />MINING HIGHWALL <br />zF <br />z � <br />HISTORIC GROUND <br />NORTH <br />3, <br />1 TOP SOIL <br />L� <br />200 0 <br />200 <br />400 600 <br />f.- 0 <br />m <br />OVERBURDEN <br />MINING SECTION <br />BACKFILL <br />C31; <br />02 <br />( IN FEET } <br />1 inch <br />= 200 ft. <br />Q <br />LEGEND: <br />z <br />PERMIT BOUNDARY ■ ■ <br />EXISTING ROAD <br />= _ _ _ _ _ = <br />Q <br />EXISTING 10 FOOT CONTOUR <br />— — — — 8010 — - <br />EXISTING 50 FOOT CONTOUR <br />— — — —8050— — <br />LL <br />z <br />PROPOSED 1 FOOT CONTOUR <br />8071 <br />O <br />PROPOSED 5 FOOT CONTOUR <br />8070 <br />m <br />� <br />= <br />Q <br />X <br />W <br />J <br />NOTES: <br />w <br />1. Reclamation to rangeland <br />will occur concurrently <br />with mining <br />activities. <br />2. Native, clean fill material <br />composed of <br />topsoil, waste rock, and <br />overburden will be used to create final <br />reclamation slopes. <br />3. As topsoil and waste rock / overburden are removed from <br />active mining areas, it will be used to create reclaimed slopes <br />and to cover the pit floor in previously mined out areas. <br />4. Final reclaimed slopes shall be 3H: 1 V or flatter. <br />5. Topsoil and waste rock / overburden not immediately used for <br />reclamation will be stockpiled on the pit floor. <br />z <br />O <br />U_ <br />J <br />0- <br />U-1 <br />d. <br />N <br />Q <br />W <br />U <br />LIJ <br />z <br />0 <br />(n <br />0 <br />0 <br />0 <br />0 <br />F- <br />H <br />z <br />0 <br />U <br />U) <br />Q <br />z <br />Q <br />U) <br />Q <br />J <br />LL <br />0 N N <br />a <br />w¢ <br />W 0 Q <br />2 U) 0 <br />MINING HIGHWALL <br />zF <br />z � <br />HISTORIC GROUND <br />3, <br />1 TOP SOIL <br />a- Q <br />a- Z <br />MINING FLOOR <br />m <br />OVERBURDEN <br />MINING SECTION <br />BACKFILL <br />z <br />O <br />U_ <br />J <br />0- <br />U-1 <br />d. <br />N <br />Q <br />W <br />U <br />LIJ <br />z <br />0 <br />(n <br />0 <br />0 <br />0 <br />0 <br />F- <br />H <br />z <br />0 <br />U <br />U) <br />Q <br />z <br />Q <br />U) <br />Q <br />J <br />LL <br />0 N N <br />a <br />w¢ <br />W 0 Q <br />2 U) 0 <br />