Laserfiche WebLink
Centennial Mine Reclamation Report 2013 <br />B- Mining Company <br />Michael Moore, President <br />e ? <br />y � <br />Picture of Centennial Mine portal following reclamation. <br />• All debris /contaminants were removed including a van and tank from <br />the premises. <br />• Left remaining temporarily is one (1) 6,000 gal tank to be removed <br />within 45 days from 9/6/2013. <br />• When dump was terraced and leveled out we spread salvaged top soil <br />and seeded the area. After the seeding a drag was pulled over the area <br />to be reclaimed to enhance covering of the seed. <br />Centennial Mine Reclamation Work & Pictures Page 2 <br />