Centennial Mine Reclamation Report 2013 <br />B- Mining Company <br />Michael Moore, President <br />The final reclamation of the Centennial Mine portal, pad and access road was <br />addressed as follows: <br />• Reclamation work was started 9/22/2012 and cat work was handled by <br />Sutherland Bros. <br />• Approximately 20 tons of ore was hauled back underground in the <br />mine. <br />• In addition the ore pad waste was also taken back underground. <br />• Sutherland Bros. used a cat to break up the cement pad and the area was <br />covered with four feet (4') of muck. <br />• Three (3) timber sets at the portal were removed and the area back filled <br />approximately thirty feet (30') inward. <br />• Then pushed dump approximately twenty feet (20') above portal to <br />close portal off. <br />Picture of Centennial Mine portal before reclamation. <br />Centennial Mine Reclamation Work & Pictures Page 1 <br />