Laserfiche WebLink
Centennial Mine Reclamation Report 2013 <br />B- Mining Company <br />Michael Moore, President <br />• The end of October 2012 the operator treated the Russian knapweed <br />patches; an additional treatment is planned after the first frost this <br />year around the end of October 2013. <br />• The pictures following were taken before any treatment in 2012. <br />r ' - <br />i <br />r <br />:A _ <br />• The four (4) catch ponds were cleaned out and the soil used to cover the <br />reclaimed dump area. <br />Centennial Mine Reclamation Work & Pictures Page 3 <br />