Laserfiche WebLink
Page 6 of 18 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />5000.00 <br />-4.00 <br />3.00 <br />-1.00 <br />3503 <br />1.502 <br />Haul Time: 1.502 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />5000.00 <br />4.00 <br />3.00 <br />7.00 <br />2398 <br />2.461 <br />Return Time <br />Total Truck Cycle Time <br />2.461 <br />7.443 <br />minutes <br />minutes <br />Loading Tool unit <br />Production 4,603.46 LCY/Hour Adjusted for job efficiency: 3,820.87 LCY/Hour <br />Truck Unit Production <br />1,409.99 LCY/Hour Adjusted for job efficiency: 1,170.29 LCY/Hour <br />Optimal No. of Trucks: 3 Truck(s) Selected Number of Trucks: 4 Truck(s) <br />Adjusted hourly truck team production: 4,681.18 LCY/Hour <br />Adjusted single truck/loader team production: 3,820.87 LCY/Hour <br />Adjusted multiple truck/loader team production: 3,820.87 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.016 /LCY <br />Total job time: 42.60 Hours <br />Total job cost: $165,409.78 <br />CIRCES Cost Estimating Software <br />