Laserfiche WebLink
Truck Bed (volume) Basis: <br />Truck <br />Loader <br />Struck Volume: <br />153.00 <br />LCY <br />Heaped Volume: <br />192.00 <br />LCY <br />Average Volume: <br />172.50 <br />LCY <br />Adjusted Volume: <br />191.37 <br />LCY <br />Final Truck Volume Based on Number of Loader Passes: <br />Loading Tool Capacity <br />Page 5 of 18 <br />174.90 LCY <br />Bucket Size Class: NA <br />Rated Capacity: 53.000 LCY (heaped) <br />Bucket Fill Factor: 1.100 Other - rock/dirt mixtures (100 -120 %) 1.100 <br />Adjusted Capacity: 58.300 LCY <br />Job Condition Corrections: Site Altitude (ft.): 7600 feet <br />Net Correction: 0.830 0.813 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.725 minutes <br />3 passes <br />Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Adj : <br />1.000 <br />0.980 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Net Correction: 0.830 0.813 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.725 minutes <br />3 passes <br />Cycle Time Factors <br />Factor (min.) <br />Source <br />Material: <br />Material 6" and over diameter 0.03 <br />0.030 <br />(Cat HB) <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high and up 0.00 <br />0.000 <br />(Cat HB) <br />Truck Ownership: <br />Common ownership of trucks and loaders -0.04 <br />-0.040 <br />(Cat HB) <br />Operation: <br />I Constant op eration -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />1 (Cat HB) <br />Truck Cycle Time: <br />Truck Exchange Time: 0.80 <br />Truck Load Time: 1.450 <br />Truck Maneuver and Dump Time: 1.20 <br />Truck Travel (Haul & Return) Time: <br />maintained 3.0 <br />Net Cycle Time Adjustment: <br />Adjusted Loader Cycle Time: <br />Net Load Time per Truck: <br />-0.050 minutes <br />0.675 minutes <br />1.450 minutes <br />Minutes Adjusted for site altitude: 0.800 Minutes <br />Minutes Adjusted for site altitude: 1.480 Minutes <br />Minutes Adjusted for site altitude: 1.200 Minutes <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, <br />CIRCES Cost Estimating Software <br />