My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-20_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2013-09-20_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:25:19 PM
Creation date
9/20/2013 10:06:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
9/20/2013
Doc Name
Cost Estiamte (Emailed)
From
Jim Stark
To
Rob Zuber
Type & Sequence
SL7
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Doze West Pit Spoil in SL -07 Areas <br />Permit Action: Partial Phase I Bond <br />Site: Colowyo Coal Mine Release SL -07 <br />PROJECT IDENTIFICATION <br />Task #: S08 State: Colorado <br />Date: 8/28/2013 County: Moffat <br />User: JRS <br />Agency or organization name: DRMS <br />Page 7 of 18 <br />Permit /Job #: C1981019 <br />Abbreviation: None <br />Filename: C019 -S08 <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D1 1R - 11U <br />Horsepower: 850 <br />Blade Type: Universal <br />Attachment: 1 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: $143.02 <br />NA <br />Operating Cost/Hour: $280.92 <br />100 <br />Ripper op. Cost/Hour: $15.45 <br />100 <br />Operator Cost/Hour: $37.41 <br />NA <br />Total unit Cost/Hour: $476.80 <br />Total Fleet Cost/Hour: $1,907.19 <br />MATERIAL OUANTITIES <br />Initial Volume: 392,841 <br />Swell factor: 1.000 <br />Loose volume: 392,841 LCY <br />Source of estimated volume <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Division of Reclamation, Mining & Safi <br />Cat Handbook <br />330 feet <br />970.5 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: -10% <br />Average site altitude: 7,600 feet <br />Material weight: 2,572 lbs/LCY <br />Weight description: User Provided <br />Job Condition Correction Factor <br />Source <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.