My WebLink
|
Help
|
About
|
Sign Out
Search
CRWAS_Phase1 Scope Final
CWCB
>
Decision Support Systems
>
DayForward
>
CRWAS_Phase1 Scope Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 10:21:34 AM
Creation date
10/16/2008 8:58:56 AM
Metadata
Fields
Template:
Decision Support Systems
Title
CRWAS - Water Availability Study of the Colorado River and Tributaries - Phase 1 Scope of Work
Description
Scope of Work for Colorado River Water Availability Study
Decision Support - Doc Type
Scope of Work
Date
8/1/2008
DSS
Colorado River
Basin
Colorado Mainstem
Contract/PO #
C154124
Bill Number
SB07-122, HB08-1346
Prepared By
Boyle Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
+ CWRRI Completion Report No. 20$ on the "Impact of Streamflow Variability on the <br />Colorado River System Operation. <br />Approach: <br />The fallowing sub-tasks are structured to avoid unfocused reviews of the thousands of pages of <br />previous Colorado River basin water studies. If not constrained, this activity would be time- <br />consuming and costly, especially if all the primary consulting team members, CWCB <br />management team, and interested parties review the original documents. <br />2.1 Pertinent Document List -Identify and list high priority (suggested for review) and lower <br />priority, readily available, previous studies and investigations pertinent to the execution <br />of primary Study tasks. The studies and investigations will include (in addition to those <br />listed above) key documents related to paleo-hydrology, previous stochastically- <br />generated traces of Colorado River flows; climate change assessments and modeling, and <br />additional relevant documents that are identified as part of subsequent tasks. Submit the <br />list to CWCB for review and comment. Based on comments from CWCB, prepare a final <br />list, The cost estimate assumes that only one review cycle will be required and that <br />modifications will not be substantial. It is assumed that CWCB staff will loan copies of <br />appropriate documents and that the consulting team will copy, ar scan into PDF format, <br />relevant sections of the documents to maintain a set of documents in a central location far <br />use of the Study team, CWCB staff, and others designated by the CWCB Study Manager. <br />2.2 Summary Briefs -Review each document identified in Task 2.1 as high priority and <br />prepare summary briefs of each document. Each summary will abstract key <br />methodologies, conclusions, numerical data, forecasts, and projected stream flows and/or <br />reservoir contents. It is assumed there will be up to 20 documents to review and <br />summarize and that each document will require an average of 4 hours from the primary <br />reviewer and 2 hours of support staff assistance to prepare the summaries. Use of the <br />summaries and detailed review of the documents pertinent to the execution of remaining <br />Study tasks are budgeted under each task. <br />Deliverables: <br />2.1 Bulleted listing of pertinent studies and investigations. <br />2.2 Technical memorandum that compiles the pertinent document summaries. <br />Task 3: Glossary and Basin Maps <br />Objective: <br />The objective of Task 3 is to provide website-ready maps and a Glossary of Terms to facilitate <br />communications with BRT members and others involved in the Study. <br />Colorado River Water Availability Study Scope 7 8/28120Q8 <br />CRWAS Phase] Contract Scope EX A Final <br />
The URL can be used to link to this page
Your browser does not support the video tag.