My WebLink
|
Help
|
About
|
Sign Out
Search
CRWAS_Phase1 Scope Final
CWCB
>
Decision Support Systems
>
DayForward
>
CRWAS_Phase1 Scope Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 10:21:34 AM
Creation date
10/16/2008 8:58:56 AM
Metadata
Fields
Template:
Decision Support Systems
Title
CRWAS - Water Availability Study of the Colorado River and Tributaries - Phase 1 Scope of Work
Description
Scope of Work for Colorado River Water Availability Study
Decision Support - Doc Type
Scope of Work
Date
8/1/2008
DSS
Colorado River
Basin
Colorado Mainstem
Contract/PO #
C154124
Bill Number
SB07-122, HB08-1346
Prepared By
Boyle Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Approach: <br />1.1 Start-up, Coordination, and Reporting -Start-up activities will focus on developing <br />invoicing and progress report protocols with the CWCB and sub-consultants, establishing <br />communication protocols, filing systems, and document control procedures. <br />• Monthly progress meetings will be conducted between the CWCB Study Manager <br />and Consultant. For budgeting purposes, up to four consulting team members will <br />attend these meetings. <br />• The consulting team will meet periodically to formally coordinate Study tasks as <br />needed. For budgeting purposes, it is anticipated that these meetings will occur <br />monthly, on average, with additional meetings and telephone conference calls during <br />peak activity periods and during preparation of key deliverables. It is assumed that <br />Consulting team's monthly meetings will be held prior to the monthly meetings with <br />the CWCB management team. Conference calls among the consulting firms will be <br />held, on average, every two weeks. Monthly meetings will be attended by up to four <br />Consultant team members, two team members budgeted in Task 1.1 and the <br />remaining team members budgeted within individual Tasks 2 through 10. <br />• Written progress reports will be submitted with each invoice and will summarize <br />progress and potential concerns, if any, on each of the major Study tasks. Invoices <br />will be prepared based on hours billed plus direct costs. The status of the major Study <br />tasks will be summarized in a table showing approved budget, costs for the invoice <br />period, cumulative costs, percent spent, estimated percent complete, estimated costs <br />to complete, remaining budget, and budget surplus/shortfall. Progress reports will <br />consist of a summary statement on overall progress and potential concerns and a brief <br />list of primary activities completed through the billing period for each of the main <br />Study tasks. <br />• It is assumed that the Consultant maybe asked to attend CWCB meetings to assist the <br />CWCB Study Manager with progress reports to the Board or to present at other public <br />meetings. For budgeting purposes, it is assumed that there will be two such meetings <br />during Phase I. The CWCB will not be billed far travel costs to the two meetings. <br />1.2 IBCC/BRT Meetings -Two progress reports will be made by the Consultant at combined <br />IBCC/BRT meetings; <br />• One as Task 6 nears completion and, <br />• One as Tasks 7 and 8 near completion and Task 9 is beginning. For budgeting <br />purposes, up to four consulting team members will attend these two meetings. <br />1.3 Public Information - A newsletter will be prepared as major tasks or milestones are <br />completed for the Study and will be provided to the CWCB to post on the CWCB <br />website. <br />For budgeting purposes, it is assumed that 10 newsletters, each no longer than four <br />pages will be prepared during Phase I and will make use of technical graphics as <br />appropriate from the Study work products. <br />It is assumed that the newsletters will not require any additional specially-prepared <br />graphics. <br />Colorado River Water Availability Study Scope 5 8/28/2005 <br />CRWAS Phasel Contract Scope EX A Final <br />
The URL can be used to link to this page
Your browser does not support the video tag.