9.3 A roach for Summarizin Model Results <br /> 9.4 Summarize Model Results <br />14 Phase I Re ortin <br /> 10.1 Draft Phase I Re ort <br /> 10.2 Worksho <br /> 10.3 Final Phase I Re ort <br />PHASE I TECHNICAL APPROACH: <br />Task 1: Proiect Mana>:ement <br />Objective: <br />The objective of Task 1 is to efficiently nrlanage an integrated consulting team and effectively <br />interface with the CWCB Study staff and others as directed. <br />Background: <br />Task 1 is comprised of project management activities (e.g., meetings, reporting, and public <br />outreach) through completion of Phase I of the Study. The legislation authorizing the CRWAS <br />charges the CWCB to work in consultation, and with the active involvement, of the BRTs. The <br />CWCB Study Manager will be supported by a Technical Consultant (Consultant). The CWCB <br />Study Manager will be responsible for the agency's contractual decisions, interpretations of work <br />scope, and payment approvals and processes. The CWCB Study Manager, supported by the <br />Consultant, will provide the interface with the BRTs, other CWCB staff, Board of Directors, <br />DNR staff, water administrators (DWR staff), and state legal staff (for example, the Colorado <br />River Subunit of the Attorney General's office}, He will determine which work products <br />prepared by the consulting team are to be provided to these and other internal and external <br />parties interested in interim and final work products. <br />One of the main purposes of the CRWAS is to provide valuable input as the BRTs evaluate <br />water needs, existing and future water shortages and water supply alternatives. Therefore, the <br />CWCB prepared a draft CRWAS Scope of Work to develop general consensus with the BRT <br />members that the Study scope of work will provide valuable input to their processes. CWCB <br />scoping efforts included the following activities prior to selection of the consulting team: <br />• Presentation of the draft scope to the IBCC members for comment, <br />• Refinement of the scope based on IBCC member comments, <br />• Receipt of BRT comments following IBCC approval of the scope, and <br />• Finalization of the scope after consideration of BRT comments and further IBCC input and <br />approval. That scope has provided the basis for this Phase I Scope of Work. <br />Colorado River Water Availability Study Scope 4 8/28/2008 <br />CRWAS Phase] Contract Scope EX A Final <br />