Laserfiche WebLink
Table 2 <br />Bijou Augmentation Plan Structures (Plan ID 0103339) <br />Component WDID Comment <br /> Plan ID used to track total pumping, depletions, and water <br />Augmentation Plan 0103339 supplies. Water supplies include natural stream flow if the <br /> downstream call is junior or no call is active. <br /> 0100507_Rch <br />Recharge Site 0103570 Reservoir IDs used to store diversions to Recharge sites. <br /> 0102061 <br />Recharge Seepage 0103339 <br />P1R Plan ID used to track lagged accretions from Recharge <br /> _ sites seepage. <br />Canal Seepage 0103339 <br />P1C Plan ID used to track lagged accretions from canal <br /> _ seepage. <br />Reservoir 0103570 Reservoir ID used to replace depletions by a storage <br /> release directly to river. <br />Direct Right Bypass 0100507 Diversion ID used to replace depletions by direct bypass <br /> of portion of direct flow right. <br />Storage Right Bypass 0103570 Diversion IDs used to replace depletions by direct bypass <br /> 0103816 of portion of storage right. <br />Lagged accretions to the South Platte River from recharge diversions are returned to the river <br />based on return flow factors and locations defined in StateMod input files. Lagged accretions <br />should be accounted in recharge accretions structures based on source of seepage water - <br />recharge site seepage (ID 0103339_P1R) or canal seepage (ID 0103339 P1C), as summarized in <br />Table 2. Canal seepage should be accounted based on simulated ditch losses from all diversions <br />to recharge when no other supplies (e.g., irrigation) are being run in the ditch. <br />One recharge water right is used to divert water from the South Platte River into the canal, Bijou <br />Creek, and Kiowa Creek. The capacity of the canal and creek where recharge water is discharged <br />is unknown. Bijou ReservoirNo. 2 is decreed for 9,183 ac-ft storage capacity. The demand for <br />the primary direct flow recharge water right should be modeled at two recharge sites located at <br />the end of the Bijou Canal, as summarized below. The additional junior recharge right decreed to <br />Goedert Reservoir under the Bijou Canal is also included in Table 3. <br />Table 3 <br />Bijou Augmentation Plan Recharge Water Rights <br />Di <br />h Recharge Site at end of Capacity / Supply <br />tc Ditch Target Amount Admin. No. App. Date <br /> Bijou Canal Recharge Area 36 <br />900 ac-ft* <br /> (ID 0100507 Rch) , 600 <br />f 44706 <br />0 5/26/1972 <br />Bijou Canal Bijou ReservoirNo. 2 9 <br />183 ac-ft c <br />s . <br />(ID 0100507) (ID 0103570) , <br /> Goedert Recharge Area 10 000 ac-ft 10,000 ac-ft 53300.0 12/6/1995 <br /> (ID 0102061) 450 cfs <br />* Equal to 600 cfs * 1.9835 ao-ftldy/cfs * 31 days <br />After its first fill, Bijou Reservoir No. 2 can be filled with the Bijou Canal 1972 recharge water <br />right. Seepage from Bijou Reservoir No. 2 first fill is not counted, whereas seepage from Bijou <br />Reservoir No. 2 filled with the 1972 recharge right is counted as a credit for the Bijou <br />A-28 ofA-106 <br />