My WebLink
|
Help
|
About
|
Sign Out
Search
SPDSS_Task7-2_WellUseWellAugmentationPlans
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task7-2_WellUseWellAugmentationPlans
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 9:38:15 AM
Creation date
6/11/2008 2:31:12 PM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 7.2 - Well Use and Well Augmentation Plans
Description
This memorandum and associated appendices characterizes the 20 largest well augmentation plans and develops recommendations for representing well use and augmentation in SPDSS modeling efforts.
Decision Support - Doc Type
Task Memorandum
Date
12/14/2007
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• The association of a well to the augmentation plan ID may be incorrect in HydroBase. <br />System Overview <br />The Bijou Augmentation Plan is used to divert junior direct flow and/or storage recharge rights, <br />in priority, when it is available in the South Platte River. Diversions to recharge through the <br />Bijou Canal are made whenever the. The ditch company prefers to run recharge water when there <br />is no irrigation water carried through the system because they receive recharge credit for the <br />ditch loss at those times. Recharge water cannot be stored into Bijou Reservoir No. 2 until the <br />reservoir completes the first fill under its storage right, used for supplemental irrigation purposes. <br />Per the decree, lagged accretions to the South Platte River from diversions to recharge are <br />accounted via the Stream Depletion Factor (SDF) method. None of the wells were historically <br />metered or have calibrated electric coefficients; therefore, no actual pump records are available. <br />Out-of-priority lagged well depletions are administered in the river below the Bijou Canal <br />headgate. <br />Recommendations <br />Recommendations for representing the Bijou augmentation plan in the initial development of the <br />SPDSS StateMod Water Resources Planning Model input files are presented below based on <br />review of the decrees and interviews with canal company personnel and Division 1 personnel. <br />Augmentation Plan Demands <br />To represent pumping for the entire SPDSS study period (1950 to present), well pumping to <br />supply irrigated lands should be estimated by the consumptive use algorithm in StateCU and <br />StateMod, to meet the irrigation water requirement less simulated surface water deliveries (if <br />applicable). Lagged well depletions affect river flows based on timing and location factors <br />defined in StateMod input files. Lagged depletions and the supplies used to meet those <br />obligations should be accounted in one Bijou Canal Well Depletions Plan structure (ID 0103339) <br />below the ditch corresponding with administration of the augmentation plan. <br />• The five wells in the Fort Morgan Farms augmentation plan (Plan ID 0102574) irrigate some <br />lands that are also irrigated by wells associated with the Bijou augmentation plan. No <br />recharge water rights, ditches, or recharge sites are associated with the Fort Morgan Farms <br />augmentation plan in HydroBase (Version 20060816). To simplify representation of the <br />smaller well augmentation plan, river depletions associated with the well use under the Fort <br />Morgan Farms plan should be aggregated with the Bijou Canal plan well depletions (ID <br />0103339) during the surface water modeling effort. <br />Augmentation Plan Supplies <br />Various sources are typically available to supply water to replace lagged well depletions. The <br />sources and the structures related to the Bijou augmentation plan recommended for inclusion in <br />the SPDSS model are summarized in Table 2. Augmentation supplies are as follows: <br />• Recharge rights from the river for the Bijou augmentation plan are summarized in Table 3. <br />• Recharge well rights and augmentation well rights are summarized in Table 4. <br />Model operations to supply well depletions (stored under plan ID 0103339) are discussed in the <br />augmentation plan operations section. <br />A-27 ofA-106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.