My WebLink
|
Help
|
About
|
Sign Out
Search
SPDSS_Task7-2_WellUseWellAugmentationPlans
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task7-2_WellUseWellAugmentationPlans
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 9:38:15 AM
Creation date
6/11/2008 2:31:12 PM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 7.2 - Well Use and Well Augmentation Plans
Description
This memorandum and associated appendices characterizes the 20 largest well augmentation plans and develops recommendations for representing well use and augmentation in SPDSS modeling efforts.
Decision Support - Doc Type
Task Memorandum
Date
12/14/2007
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
augmentation plan. Releases from Bijou Reservoir No. 2 to Kiowa Creek using water stored <br />under the 1972 recharge water right can be used to make replacements under the plan. <br />Augmentation Plan Operations <br />Operating rules to replace river depletions from well pumping include the following in order of <br />use: <br />1. Well depletions (stored under plan ID 0103339) should be replaced year-round by natural <br />flows when in priority, i.e., when no downstream call or when downstream call is junior to <br />common priority date of June 7, 1969 (admin. no. 43622.0) used for wells in Bijou <br />augmentation plan. <br />2. Well depletions (stored under plan ID 0103339) should be replaced year-round with available <br />recharge accretions from canal seepage (stored under plan ID 0103339_P1C) and recharge <br />seepage (stored under plan ID 0103339_P1R). <br />3. Remaining well depletions (stored under plan ID 0103339) should be replaced year-round <br />with Bijou Reservoir No. 2 releases down Kiowa Creek, based on a decreed factor of 55 <br />percent credit in the river (i.e., 10 cfs Bijou Reservoir No. 2 storage release yields 5.5 cfs <br />recharge credit). Note that by decree, these releases are credited to recharge only when the <br />released water does not reach the river. <br />4. Remaining summer well depletions (stored under plan ID 0103339) should be replaced with <br />a bypass of a portion of the Bijou Canal direct flow water right. Operations of a bypass <br />require maintenance of historical return flows, which should be added to the well depletion <br />Plan structure demand (ID 0103339). <br />5. Remaining winter well depletions (stored under plan ID should be replaced with a bypass of <br />a portion of the Empire Reservoir or Bijou Reservoir No. 2 storage). <br />A-29 ofA-106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.