My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08292
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08292
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:47:39 PM
Creation date
10/12/2006 2:53:01 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.400
Description
The Colorado Big Thompson Project - Reports
Basin
South Platte
Water Division
1
Date
1/4/1951
Title
General Recreation Development Outline to accompany General Recreation Development Plan for East Portal Adams Tunnel - CBT Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o <br /> <br />,."') <br /> <br />f." <br />CJ1 <br />C.1 <br />00 <br /> <br />;" <br /> <br />4. Provide suitable illumination for evening use at parking <br /> <br />~reas, walkways, and exhibit building. <br /> <br />G. Plantinlls <br /> <br />1. Provide planting, to screen out contrc.ctorsl equipment yard <br /> <br />tC' the east. <br /> <br />2. Establish ground cover on the wasto disposal area and on the <br /> <br />nut section above the tunnel outlet. <br /> <br />3. Provide groupings of pine and spruce on the waste disposal <br /> <br />area and on slopes above the portal. <br /> <br />H. other Considerations <br /> <br />1. Remove or plaoe underground the Wind River by-pass pipe <br /> <br />looated'along the north shore of the reservoir (not shawn on the plan). <br /> <br />2. Remove or plaoe underground the three-inoh water line 100"-('0<1 <br /> <br />on the slope north of the reservoir (not shown on the plan). <br /> <br />3. Remove the temporary observation house located on the north <br /> <br />shore of tho reservoir (not included on the plan). <br /> <br />4. Eliminate domesti'O grazing on Bureau of Reolamation land in <br /> <br />this area. <br /> <br />5. It is proposed that the present oonorete portal be redasip'\ed <br /> <br />and built in order that it be more in harmony with existing adjacent <br /> <br />natural features. <br /> <br />I. Develogment Costs (estimated) <br /> <br />Development is separated into two phases to provide the minimum <br /> <br />of: development in the first phase to make the area innnediately available <br /> <br />to the public. <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.