My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08292
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08292
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:47:39 PM
Creation date
10/12/2006 2:53:01 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.400
Description
The Colorado Big Thompson Project - Reports
Basin
South Platte
Water Division
1
Date
1/4/1951
Title
General Recreation Development Outline to accompany General Recreation Development Plan for East Portal Adams Tunnel - CBT Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(j <br />") <br />f~. <br />Ul <br />(~\) <br />c:c <br /> <br />For location of the dovoloplOOnts listed, see G'3neral Recreational <br /> <br />De vel optnent Plan, Drawi ng No. RS/EP-7100b. <br /> <br />1. Construct loop turn-around at end of existing Bureau <br />of Reclama ti on road. flexibl e type paved surfaoe - <br />1450 sq. yd. @ $2.00 $2,900,00 <br /> <br />2. Main parking area. gravel surfaoing - 60 oar <br />capa ci ty 2.400 oon <br /> <br />3. Supplemental parking area, gravel surfacing - <br />10 car capaci,ty 400.00 <br /> <br />4. Display building to house Bureau of Reclamation <br />model of Trahsmountain Diversion Project. Building <br />to oontain office space for custodian and comfort <br />station. 40,000008 <br /> <br />5. Access walks, conorete oonstruotion, extending from <br />parking area to comfort station, to display building <br />and around' the reservoir as shown on plan. Approxi- <br />mately 220 cu. yd. @ $50.00 11,00~,O? <br /> <br />6. Water supply syst~ <br /> <br />a. Pump house complete with pump and ohlorinating <br />device located near junotion of Wind River and <br />tunnel (not shown on plan) . 3,OC().OO <br /> <br />b. Water supply pipo line - 2250 lin. ft. @ $6000 13,,500,00 <br /> <br />c. Water reservoir, buried, reinforoed concrete <br />tank --.:J...e.~2Q,;'Q.Q. <br /> <br />$18,000.00 <br /> <br />7. Drinking fountain near comfort station and hydrant <br />in picnic area $ <br /> <br />150000 <br /> <br />8. Sewage disposal system to include connecting <br />sewer lines, septic tank. and disposal field <br /> <br />12.000000 <br /> <br />-;:- <br /> <br />9. Pit toile'c - double for men ,and women <br /> <br />~~)O ~OO <br /> <br />For supervision <br /> <br />8,89.2~00 <br />$96,500.00 <br /> <br />Estimated cost of 1st Phase <br /> <br />,_2nd Phase <br /> <br />1. Horse trail - 3.400 lin. ft. (includes 300 lin. <br />ft. foot trail) @ 25t <br /> <br />$ <br /> <br />850.00 <br /> <br />7 <br /> <br />.'. -" ,Y "<"-;.': ,_~--,,_ :-'" <br />
The URL can be used to link to this page
Your browser does not support the video tag.