My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08292
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08292
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:47:39 PM
Creation date
10/12/2006 2:53:01 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.400
Description
The Colorado Big Thompson Project - Reports
Basin
South Platte
Water Division
1
Date
1/4/1951
Title
General Recreation Development Outline to accompany General Recreation Development Plan for East Portal Adams Tunnel - CBT Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(j <br /> <br />I,'" ") <br /> <br />q,..,,. 4. Provide a horse trail up the ":ind River Valley, paralleling <br />(Jl <br />t.) the Bureau of Reclamation road and extending into Rocky l~untain National <br />'...:1 <br /> <br />, Park to connect with existing trails. <br /> <br />5. Construct two hitching racks in locations indicated on the <br /> <br />plan. <br /> <br />6. Construct foot trail from north end of dam to connect with <br /> <br />horse trail. <br /> <br />D. Picnickiu"fi <br /> <br />1. Esteb'.;R<" e picnio area as indicated on the plan. <br /> <br />2. Provide:S picnic tables and grates. <br /> <br />3. Provide e'er garbage and waste disposal. <br /> <br />4. Establi.s:.l a group picnic fire circle on the ridge in the <br /> <br />general location indioe,ted on the plan. <br /> <br />E. In conjunction with the walkways along the reservoir shore, pro~ <br /> <br />vid,9 fishing piers of a type that will be in keeping with the serenity of <br /> <br />,~, - <br /> <br />i;}~.,; aw,a and which will meet the requirements of the Fish and Vlildlife <br /> <br />8 6 ..~y i.JA 0 <br /> <br />FUtilities <br /> <br />L Insta:..J 'Gvro flood lights--one inside th'.] p'ort".J und one i"1 the <br /> <br />outlet to illUinino.-i:;e the reservoir. <br /> <br />" <br /> <br />2. Provide drinking ,~ter ut the drinking fountain und at the <br />I <br /> <br />; <br /> <br />hydrant (probable 'source--Wind River). <br /> <br />, <br /> <br />3. Construct two comfort stations~~one (flush tJ~e) in the vicinity <br /> <br /> <br />of the drinking fountain and one (pit type) in the picnic area, as shown on <br /> <br />I <br /> <br />the plan; the pit type to also be flush type if sewer line will permit. <br /> <br />5 <br /> <br />" <br />
The URL can be used to link to this page
Your browser does not support the video tag.