My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08292
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08292
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:47:39 PM
Creation date
10/12/2006 2:53:01 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.400
Description
The Colorado Big Thompson Project - Reports
Basin
South Platte
Water Division
1
Date
1/4/1951
Title
General Recreation Development Outline to accompany General Recreation Development Plan for East Portal Adams Tunnel - CBT Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />':.'::> <br />c) <br />""... <br />(Jl <br />C'" , <br />en <br /> <br />, <br /> <br />.,-." .-.,' <br /> <br />-"",," <br /> <br />it seems there will be a demand for a group picnic fire cirole, we have <br /> <br />shown suoh a facility on the plan and desigroted it "Campfire Circle." <br /> <br />4. ~king and HO,rsebaok Riding <br />The mast Portal area could well beoome a terminus for shOrt <br /> <br />hikes and rides from the oommunity of Estes Park, and the necessary <br /> <br />fad Ii ties for these aotivi ties should be provided. <br /> <br />Further study may reveal that tho present Wind River Trail, <br /> <br />whioh follows Aspen Brook, could be rerouted near this area. <br /> <br />III PROPOSED DEVELOPMENTS <br /> <br />A. Roads <br /> <br />1. Extend the existing Bureau of Reolamation road some 200 feet" <br /> <br />as indioated on the plan. <br /> <br />2. Provide a ~rking area for 60 cars and a turn-around at th8 <br /> <br />ter.minusof the road. <br /> <br />3. Provide a turnout parking for 10 cars at the end of the <br /> <br />present .road. <br /> <br />B. Educational Features <br /> <br />Construct an exhibit building in which to house a model of the <br /> <br />transmourttain diversion project to be located at the north end of the da~. <br /> <br />, <br />C . Trails and Walkways <br />1. Construct a surfaced walkway from parking areas to top of <br /> <br />dam and to displ~ shelter. <br /> <br />2. Construot surfaoed walkway along top of dam and around display <br /> <br />shelter. <br /> <br />3. Surfaoe service road along north shore of reservoir for <br /> <br />pedestrian use. <br /> <br />4 <br /> <br />" <br />,'of" <br />
The URL can be used to link to this page
Your browser does not support the video tag.