My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08275
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08275
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:47:35 PM
Creation date
10/12/2006 2:51:42 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
2/19/1941
Title
Draft of Proposed Findings and Recommendations for the Effectuation of Boulder Canyon Project Adjustment Act: Part I
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.-I <br />-' <br />1::". <br />c:-.! <br /> <br />c <br /> <br />However, where the operation and maintenance is common to several. <br /> <br />groups or sections, the costs shall be apportioned between groups <br /> <br />on a main unit position basis, considering an 82,500 kv-a. unit as <br /> <br />one position and a 40,000 kv-a. unit as a half position. Further <br /> <br />apportionment wi thin groups shall be on the basis of energy actually <br /> <br />takGIl, both firm and secondary, with the mininmm annual obligation <br /> <br />of each allottee as the minimum amount of energy considered. <br /> <br />ReplacemEnt Reserves for Generdiug M2chinory and Equi'oment. <br /> <br />The annui tie s for replc'.cemen t reserves shall be computEd, as <br /> <br />discus sed under "Energy Rates", at the rate of 1.25% :x r annum of the <br /> <br />cost of gmorating machinery and equit'ment. All i terns or parts, the <br /> <br />installed cost of which is $5,000 or more at time of replacement, <br /> <br />shall be charged to replacement reserve. All items or parts, the <br /> <br />installed cost of ~hich is less than $5,000 at time of replacement, <br /> <br />sh2.11 be chf'.rgcd to maintenance. ChB.rges shall be apportioned in <br /> <br />the same manner as amortization of advances for generating <br /> <br />machinery and equipment is e.pportioncd. <br /> <br />Sto.tion Service Generating IUld Common FclCili ties. <br /> <br />The annual cost of operation and maintennnce, replacements <br /> <br />ffi1d amortization of construction cost of station service generating <br /> <br />and other common facilities used in supplying power in the power <br /> <br />plant, dam rmd appurtennnt works (exclusive of BoulderCity) and <br /> <br />services to various generating units in the power p12nt shall be <br /> <br />apportioned on a position basis to the tillits then installed. <br /> <br />Eo.ch 82,500 kv-a. unit shall bo considered as one position and <br /> <br />each 40,000 kv-a. unit 2.S one-half" position. Further apportion- <br /> <br />ment lid. thin a unit or group of units shl'.11 be on the basis of <br /> <br />~/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.