My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08275
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08275
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:47:35 PM
Creation date
10/12/2006 2:51:42 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
2/19/1941
Title
Draft of Proposed Findings and Recommendations for the Effectuation of Boulder Canyon Project Adjustment Act: Part I
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />C'J <br />- <br />17 <br />C",! <br /> <br />c <br /> <br />energy actually tnken, both firm 2nd secondary, with the minimum <br /> <br />annual obligution of each allottee concerned as the minimum <br /> <br />amolmt of enGTgy considered. <br /> <br />Power used by the United States for operation and maintenance <br /> <br />of the power plant building, dam and appurtenant works (exclusive <br /> <br />of Boulder City) covers the reglirements of a service comon to <br /> <br />all allottees. The complications and expense involved in metering, <br /> <br />accounting and billing such power do not seem warranted and there- <br /> <br />fore as a step toward simplification of procedure no charge shall <br /> <br />be made against the United States for such power. The energy <br /> <br />used in such service shall be considered as part of the station <br /> <br />losses and shall not be conSidered in the determination of firm <br /> <br />and secondary energy in connection with the fixing of rates and <br /> <br />charges. <br /> <br />Use of ]}):lits Otherwise Than in Regular Assignmm t. <br /> <br />In the event any allottee desires at any time to make use <br /> <br />of equipment upon which some other allottee is obligated to <br /> <br />carry the charges, the ust? the reof and the charges therefor <br /> <br />shall be the subject of such mutual agreement as may be decided <br /> <br />upon B.t the time by the parties affected. <br /> <br />4. ADJUS'TI:'ENTS OF RATES AND CHARGES. <br /> <br />Energy rates as affected by revenues from firm and secondary <br /> <br />enorgy and sale of stored we.tcr, shall be acijusted as of June 1, <br /> <br />1947, and at five-year intervals theree.ftor. <br /> <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.