My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08166
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:30:24 PM
Creation date
10/12/2006 2:47:18 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.850
Description
Metro Water Supply Investigation - MWSI
State
CO
Basin
South Platte
Date
8/16/1994
Author
Hydrosphere
Title
Phase II Plan of Study
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. . <br /> <br />Metropolitan Water Supply Investigations - Phase II Plan of Study <br />8/16/94 5:04 PM <br /> <br />Page 29 <br /> <br />4. Sub-Task 5d: Phase II Systems Integration Swnmary Report <br /> <br />a) Purpose <br /> <br />To present the findings of the T AC's ongoing brainstorming and review <br />efforts, done as a part of Task 16, as they pertain to system integration ideas <br />suitable for further study in Phase m. <br /> <br />b) Approach <br /> <br />Meetings will be held with the Systems Integration Work Group, supported by <br />the map and data developed in Task 4.1., to "brainstorm" on specific topic <br />areas pertaining to new water supply proposals, individual water supply <br />systems or system components, facilities, and water rights. Initial topics may <br />include MoffatlCBT/Windy Gap potentials, South Platte Reservoir joint <br />operation possibilities, and uses of Chatfield Reservoir. Various system <br />integration and augmentation proposals accumulated by Denver Water and <br />others may also be considered. <br /> <br />The results of the T AC's meetings during Phase II will be compiled into a <br />summary report. <br /> <br />c) Output <br />A summary report document. <br /> <br />d) Sub-Task Leader: Lee Rozaklis <br /> <br />5. Sub-Task 5e: Phase II Screening <br /> <br />a) Purpose <br />To select the most promising water supply options for further study, and to <br />scope the next phase of the Project. <br /> <br />b) Approach <br />The T AC and the PMT will meet to review and discuss the Task 5 summary <br />reports and set priorities for the Project's next phase, Specific areas of study <br />will be identified. <br /> <br />c) Output <br /> <br />A phase III scope of services, including a list of selected topics for further <br />study. <br />
The URL can be used to link to this page
Your browser does not support the video tag.