My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08166
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:30:24 PM
Creation date
10/12/2006 2:47:18 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.850
Description
Metro Water Supply Investigation - MWSI
State
CO
Basin
South Platte
Date
8/16/1994
Author
Hydrosphere
Title
Phase II Plan of Study
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. , <br /> <br />. <br /> <br />Metropolitan Water Supply Investigations - Phase II Plan of Study <br />8/16/94 5:04 PM <br /> <br />Page 30 <br /> <br />d) Sub-Task Leader: Robert Weaver <br /> <br />c. Task 6: Phase III Plan of Study <br /> <br />a) Purpose <br />Based on the results of Phase II including Sub-task 5e, this task will develop a <br />plan of study for the next phase of the Project. <br /> <br />b) Approach <br />The consultant team will incorporate the results of Phase II including the <br />TAC's Phase II screening efforts into a draft Phase ill Plan of Study. This <br />draft will be review by the T AC and PMT and comments will be incorporated <br />into a final Phase III Plan of Study. <br /> <br />c) Output <br />A draft and final Phase III Plan of Study will be prepared, <br /> <br />d) Task Leader: Lee Rozaklis <br /> <br />D. Task 16: Ongoing Project Administration and Oversight <br /> <br />a) Purpose <br /> <br />Provide overall coordination of efforts and communication among the T AC, <br />the Project Management Team (PMT) the State Management Team and the <br />Consulting Team and regular reporting of study progress and budgetary <br />matters. <br /> <br />Continue exploring system integration opportunities during Phase 1 of the <br />MWSI project, using infonnation as it comes available from other Phase 1 <br />efforts. Provide a sounding board and infonnation source for ongoing Phase 1 <br />studies, including revisions to system map and water supply inventory and <br />accounting. Identify pinch points, existing and potential interconnections and <br />water supply process related issues. <br /> <br />b) Approach <br />The PMT and the State Management Team will meet on a monthly basis <br />through the course of Phase II, <br /> <br />The TAC Work Groups will meet on sequentially on September 20, 1994 to <br />review and discuss study progress. The date for this meeting may be <br />postponed if work on Phase II begins later than August 1, 1994. Adeast one <br />
The URL can be used to link to this page
Your browser does not support the video tag.