My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08166
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:30:24 PM
Creation date
10/12/2006 2:47:18 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.850
Description
Metro Water Supply Investigation - MWSI
State
CO
Basin
South Platte
Date
8/16/1994
Author
Hydrosphere
Title
Phase II Plan of Study
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Metropolitan Water Supply Investigations - Phase II Plan of Study <br />8/16/94 5:04 PM <br /> <br />Page 22 <br /> <br />accomplished through five sub-tasks, Sub-tasks 5a through 5d will address each of <br />the four identified Phase II focus areas while sub-task 5e will provide a screening <br />function. Work under this task will be based on the results of task 4 and will not <br />involve any significant modeling analyses. <br /> <br />Task Leader' Lee Rozaklis <br /> <br />Key Technical Support: Technical staff from Hydrosphere and subcontractors as <br />needed, <br /> <br />1. Sub-Task Sa: Conjunctive Use Options and Swnmary Report <br /> <br />a) Purpose <br /> <br />Based upon the location, extent, and availability of both groundwater and <br />surface water supplies identified for conjunctive use, generally formulate <br />operational alternatives for integrated use of the sources that maximize new <br />firm yield water supplies for the metro area. <br /> <br />Based upon an understanding of both the physical and economic depletion of <br />the non-tributary Denver Basin aquifers, determine, for the operational <br />schemes identified, the length of time the groundwater system may be utilized. <br />Assess the operational schemes based upon the length of time to system <br />depletion. <br /> <br />Summarize the technical, legal, economic, and environment.al issues explored <br />during Phase II pertaining to this subject area in a single report format. <br /> <br />b) Approach <br />Identify, through research of existing materials and reports and through <br />brainstorming, the alternatives for using groundwater to maximize yields from <br />the various surface water supplies. In particular, review and evaluate the <br />study of conjunctive use yield prepared by the Denver Water, and any similar <br />. studies conducted for Barr Lake supplies. <br /> <br />Evaluate the firm yield of the various operational alternatives identified for <br />each of the surface water supplies. <br /> <br />Evaluate the firm yield and operational schemes that can be developed by the <br />addition of small scale, local storage reservoirs. <br /> <br />Evaluate the firm yield and operational schemes that can be developed through <br />aquifer recharge programs. <br /> <br />Determine preliminary schemes for the collection, treatment, and distribution <br />of both the groundwater and surface water components to generate a broad <br />
The URL can be used to link to this page
Your browser does not support the video tag.