My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08166
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:30:24 PM
Creation date
10/12/2006 2:47:18 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.850
Description
Metro Water Supply Investigation - MWSI
State
CO
Basin
South Platte
Date
8/16/1994
Author
Hydrosphere
Title
Phase II Plan of Study
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Metropolitan Water Supply Investigations - Phase II Plan of Study <br />8/16/94 5:04 PM <br /> <br />Page 21 <br /> <br />b) Jlpproach <br /> <br />Poll individual water suppliers regarding their market interests or needs. <br />Incorporate into an initial portrayal of existing water marketing opportunities. <br />Get design feedback from suppliers regarding display of market bulletin board <br />infonnation and individual access capabilities. <br /> <br />c) Output <br /> <br />An initial portrayal of existing water marketing opportunities along with a <br />design document for market bulletin board development including data <br />display, access and updating capabilities. <br /> <br />d) Sub-Task Leader: Jim Brannon <br /> <br />14. Sub-task 4n: Inventory of Available Tools <br /> <br />a) Purpose <br />Detennine the availability and suitability of existing models and other <br />analytical tools for addressing questions related to hydrology, water rights <br />systems operations and yield that arise during the course of the project. <br /> <br />b) Jlpproach <br />Conduct a review of existing models including Denver's BESTSYM model, <br />the South Platte Water Rights Administration Model and other relevant models <br />made available to the Project. Assess issues of geographic coverage, time <br />step, study period, flexibility, comprehensiveness, user interface, portability. <br /> <br />c) Output <br />A task memorandum listing models reviewed, their respective characteristics, <br />and their relative suitability for the Project's modeling needs. <br /> <br />d) Sub-Task Leader: Lee Rozaklis <br /> <br />B. Task 5: Initial Identification of Options <br /> <br />Overview. Using the results of Task 4 activities, the consultant team along with the <br />TAC will initially identify and generally fonnulate cooperative water supply options <br />for further investigation and detailed analysis and evaluation. This will be <br />
The URL can be used to link to this page
Your browser does not support the video tag.