Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />Plan <br />Idnt <br /> <br />I <br /> <br />Table 2 <br />Proposed plans Arranged by Category <br /> <br />Plan <br />Description <br /> <br />Total <br />Value <br />Points <br /> <br />Catt:!oorv I <br />A- I Operate YDP as planned (Base Case) <br />A- 2 Ope:r:ate YD~ with off-peak powe r <br />A- 3 Operate YD~ with non-firm power <br />A- 4 Operate YD~ with off-peak, non-firm power <br />A- 5 Install state-of-the-art low press. membranes <br />A- 6 Use 1/3 effective capacity of YDP <br />A- 6A Use 2/3 effective capacity of YDP <br />A- 7 Pre-pay fut ure electrical capacity .charges <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Cateaorv <br />B- 4 <br />B- 4A <br />B- 6A <br />B-1a <br />B-21 <br /> <br />I <br /> <br />I <br /> <br />Cateaorv <br />A- a <br />A- aA <br />B- 3 <br />B- 5 <br />B- 6 <br />B- 7 <br />B-13 <br />B-17 <br />B-19 <br />B-22 <br />B-30 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Cateaorv <br />B- a <br />B- 9 <br />B-10 <br />B-11 <br />B-20 <br />B-25 <br />B-27 <br />B-2a <br />B-29 <br />c- 3 <br />c- 4 <br />c- 5 <br />c- 6 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Cateaorv <br />B- 1 <br />B- 2 <br />B-12 <br />B-14 <br />B-15 <br />B-16 <br />B-23 <br />B-24 <br />B-26 <br />c- 1 <br />c- 2 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />1173 <br />1043 <br />105a <br />100a <br />1056 <br />105a <br />106a <br />996 <br /> <br />II <br />Implement weather modification (80,000 acre-feet del. to Mex) <br />Implement weather modification (116,000 acre-feet del. to Mex) <br />Implement vegetation management (Phreatophyte Control) 75% <br />Lease indian land <br />Relieve part. District debt in exchange for sub. water <br /> <br />970 <br />965 <br />92a <br />1016 <br />967 <br /> <br />Annual <br />Cost <br />($1 Mil.) <br /> <br />27.5 <br />25.9 <br />24.6 <br />20.2 <br />25.8 <br />20.2 <br />23.5 <br />27.5 <br /> <br />7.8 <br />0.9 <br />14.6 <br />11" 6 <br />6.4 <br /> <br />28.3 <br />23"4 <br />20.4 <br />22.4 <br />21. 0 <br />29.1 <br />30.9 <br />24.2 <br />27.8 <br />23.9 <br />27.2 <br /> <br />a.o <br />18.4 <br />Drop <br />13.9 <br />10.1 <br />Drop <br />Drop <br />Drop <br />24.0 <br />12.4 <br />12.4 <br />16.0 <br />0.4 <br /> <br />v <br />Pump from PRPU to NIB <br />Pump from PRPU to Arizona water users <br />Build off-stream reaervoirs <br />Enlarge Painted Rock Reservoir <br />Modify Painted Rock Reservoir operations <br />Develop ground-water recharge <br />Find alternate uses for untreated drain <br />Develop Rocky Mtn east-slope exchange <br />Desalt upstream brine inflows (Title II <br />Compensate Mexico <br />Compensate Arizona <br /> <br /> 1067 36.7 <br /> 1052 37.9 <br /> 618 105.4 <br /> 964 42.1 <br /> 949 36.1 <br /> 945 4a.0 <br />water 1027 36.0 <br /> 934 37.0 <br />projects) 950 3a.8 <br /> 999 35.5 <br /> a90 39.5 <br /> <br />--------------------------------------------------------------------------------------- <br /> <br />III <br />Install solar power generator (w/o use of rej. stream) <br />Install solar power generator (with use of rej. stream) <br />Finance cost of onfar.m improvements <br />Management of Watershed <br />Implement Vegetation Management (Phreatophyte control) 50% <br />Impro~e irrigation systems - Arizona <br />Enlarge proposed Spring Canyon Reservoir <br />DeveLop other weLl fields <br />Buyout Well ton-Mohawk Irrigation and Drainage District <br />Compensate far.mers for lost production during dry years <br />~xpand Water Management & Conservation in Wellton-Mohawk <br /> <br />1040 <br />1067 <br />1057 <br />1032 <br />930 <br />1047 <br />1026 <br />966 <br />1037 <br />1011 <br />926 <br /> <br />IV <br />Improve irrigation systems - California <br />Install welL field adjacent to the All-American Canal <br />Obtain water from "Closed Basin" project in Colorado <br />Use unallocated storage in Fontenelle Reservoir <br />Purchase water rights by Fed. Gov (excluding Wellton-Mohawk) <br />Develop trans-basin diversion into Colorado River Basin <br />Implement M'I Conservation <br />Implement Yuma Mesa ~ntitlement Exchange <br />Use unallocated storage in Alamo Reservoir <br />Negotiate Max~um allowable salinity level at NIB <br />Breach Minute 242 up to a maximum salinity level <br />Modify Colorado River operations <br />Require all water users to provide rete flows of accep. quality <br /> <br />851 <br />a63 <br />o <br />945 <br />1003 <br />o <br />o <br />o <br />10a3 <br />1005 <br />a73 <br />772 <br />764 <br />