My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07975
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07975
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:38 PM
Creation date
10/12/2006 2:42:13 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8278.100
Description
Title I - Yuma Desalting Plant
Basin
Colorado Mainstem
Date
10/1/1987
Author
USDOI/BOR
Title
Yuma Desalting Plant Operations Study - Draft Special Report
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />GROUP B - PROVIDE SUBSTITUTE WATER ~OR BYPASSED <br />DRAINAGE WATER <br />Plan B-1. Pump Water from Protective and <br />Regulatory Pumping Unit (PRPU) Wells to the <br />NIB. <br />Plan B-2. Pump Water from PRPU to Arizona Water <br />Users. <br />Plan B-3. Finance Cost of Onfarm Improvements <br />(Below Imperial Dam). <br />Plan S-4. Implement Weather Modification. <br />80,000 acre-feet delivered to Mexico) <br />Plan B-4A. Implement Weather Modification. <br />116,000 acre-feet delivered to Mexico.) <br />Plan a-5. Management of Watershed. <br />Plan 8-6. Implement Vegetation Management <br />Phreatophyte Control). (50-percent <br />management. ) . <br />plan B-6A Implement Vegetation Management. (75- <br />percent management.) <br />Plan B-7. Improve Irrigation Systems - Arizona. <br />Plan 8-8. Improve Irrigation Systems - <br />California. <br />Plan B-9. Install Well ~ield Adjacent to All- <br />American Canal. <br />Plan 8-10. Obtain Water from "Closed Basin" <br />Project in Colorado. <br />Plan 8-11. Use Unallocated Storage in ~ontenelle <br />Reservoir. <br />Plan 8-12. Build Offstream Reservoirs. <br />Plan B-13. Enlarge Proposed Spring Canyon <br />Reservoir. <br />Plan e-14. Enlarge Painted Rock Reservoir. <br />Plan 8-15. Modify Painted Rock Reservoir <br />Operations. <br />8-16. Develop Ground-Water Recharge. <br />B-17. Develop Other Well Fields. <br />8-18. Lease Indian Land. <br />e=-19. Buy Out Wellton-Mohawk- Irrigation and <br />Drainage District. <br />Plan B-20. Purchase of Water Rights by Federal <br />Government (excluding Wellton-Mohawk). <br />Plan 8-21. Forgive Participating Districts' <br />Indebtedness in Exchange for Substitute <br />Water. <br />Plan 8-22. Compensate Farmers For Lost Production <br />During Dry Years. <br />Plan B-23. Find Alternate Uses For Untreated <br />Drain Water. <br />Plan 8-24. Develop Rocky Mountain East-Slope <br />Exchange. <br />Plan 8-25. Develop Trans-Basin Diversions Into <br />Colorado River Basin. <br /> <br />(With <br /> <br />(With <br /> <br />Plan <br />Plan <br />Plan <br />Plan <br /> <br />vi <br /> <br /> I <br /> I <br />19 I <br />20 I <br />20 <br />21 I <br />21 <br />22 I <br />22 <br />23 I <br />23 I <br />23 <br />24 I <br />24 <br />25 I <br />25 <br />26 I <br />26 <br />27 <br />27 I <br />27 <br />28 I <br />28 <br />29 <br />30 I <br />30 I <br />31 <br />31 I <br />32 I <br />32 <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.