My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07975
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07975
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:38 PM
Creation date
10/12/2006 2:42:13 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8278.100
Description
Title I - Yuma Desalting Plant
Basin
Colorado Mainstem
Date
10/1/1987
Author
USDOI/BOR
Title
Yuma Desalting Plant Operations Study - Draft Special Report
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />Plan 8-26. Desalt Upstream Brine Inflows (Title <br />II Projects). <br />Plan B-27. Implement Municipal and Industrial <br />Conservation. <br />Plan 8-28. Implement Yuma Mesa Entitlement <br />Exchange. <br />Plan 8-29. Use Unallocated Storage in Alamo <br />Reservoir, Bill Williams River. <br />Plan e-30. Expand Water Management and <br />Conservation (WMC) Program in the Wellton- <br />Mohawk Irrigation and Drainage District. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />GROUP C - PLANS THAT REQUIRE INSTITUTIONAL CHANGES <br />Plan C-l. Compensate Mexico. <br />Plan C-2. Compensate Arizona. <br />Plan C-3. Ne~otiate Maximum Allowable Salinity <br />Level at NIB. <br />Plan C-4. Breach Minute No. 242 up to a Maximum <br />Salinity Level. <br />Plan C-5. Modify Colorado River Operations. <br />plan C-6. Require All Water Users to Provide <br />Return Flows of Acceptable- Water Quality. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />RESULTS <br /> <br />I <br /> <br />RECOMMENDATIONS <br /> <br />APPENDIX A - DEVELOPMENT OF RATING CRITERIA <br /> <br />I <br /> <br />APPENDIX B - COMPUTER MODEL YDPSHORT.FOR <br /> <br />APPENDIX C - COSTS <br /> <br />I <br /> <br />TABLES <br /> <br />P'ollowing Pg. <br />ii <br /> <br />I <br /> <br />1 Plans Proposed for ConBideration. <br />2 Proposed Plans Arranged by Category <br />3 - Summary of Estimated Yields <br />4 - Team Evaluation of Proposed YDP Plans. <br />S - Proposed Plans in Order of Decreasing Points <br />6 - Proposed Plans Arranged in Order of Increasing Costs. <br />7 - Proposed Plans Arranged by Category. <br /> <br />I <br /> <br />I <br /> <br />FIGURES <br />1 - Example of Matrix Evaluation <br />2 - Total Raw Scores <br />3 - Average Unit Scores. <br />4 - Ranking Analysis <br />5 - Evaluation Criteria Matrix Analysis. <br /> <br />I <br /> <br />I <br /> <br />MAP <br />Location Map of Yuma Desalting Plant Facility <br /> <br />I <br /> <br />vii <br /> <br />I <br /> <br />32 <br /> <br />33 <br /> <br />33 <br /> <br />33 <br /> <br />34 <br /> <br />34 <br />34 <br />35 <br /> <br />35 <br /> <br />36 <br />36 <br /> <br />37 <br /> <br />38 <br /> <br />41 <br /> <br />42 <br /> <br />46 <br /> <br />62 <br /> <br />iii <br />18 <br />38 <br />38 <br />38 <br />40 <br /> <br />42 <br />42 <br />42 <br />42 <br />45 <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.