My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07975
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07975
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:38 PM
Creation date
10/12/2006 2:42:13 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8278.100
Description
Title I - Yuma Desalting Plant
Basin
Colorado Mainstem
Date
10/1/1987
Author
USDOI/BOR
Title
Yuma Desalting Plant Operations Study - Draft Special Report
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'I <br /> <br />'I <br /> <br />I <br /> <br />COIITIIIITS <br /> <br />FRONTISPII!:CI!: <br /> <br />I <br /> <br />EXECUTIVE SUMMARY <br />PURPOSE <br />BACKGROUND <br />EVALUATION PROCI!:DURI!: <br />RESULTS <br />RECOMMI!:NDATIONS <br /> <br />.. <br /> <br />I <br /> <br />I <br /> <br />INTRODUCTION . <br />PURPOSE <br />LOCATION <br />SUMMARY OF DI!:SALTING PROCESS <br />BACKGROUND <br />COMPOSITION OF TEAM . <br /> <br />1 <br /> <br />I <br /> <br />IDENTIFICATION OF PROPOSED PLANS <br /> <br />1 <br /> <br />EVALUATION PROCEDURE <br />DI!:TERMINATION OF YIELDS <br />I!:STIMATI!: OF YDP OPERATING YEARS <br />DI!:TERMINATION OF IMPACTS OF YDP PRODUCTION <br />DI!:TERMINATION OF ANNUAL COSTS <br /> <br />1 <br /> <br />DI!:SCRIPTION OF PROPOSE~ PLANS <br />GROUP A - OPERATIONAL AND STRUCTURAL CHANGES TO YDP <br />Plan A-I. Operate the YDP as Presently Planned <br />(Base Case). <br />Plan A-2. Operate the YDP with Off.-Peak, Firm <br />Power. <br />Plan A-3. Operate the YDP with Non-Firm Power. <br />Plan A-4. Operate the YDP with Off-Peak, Non-Firm <br />Power. <br />Plan A-5. Install State-Of-The-Art Low-Pressure <br />Membranes. <br />Plan A-6. Use 1/3 Effective Capacity of the YDP. <br />Plan A-6A. Use 2/3 Effective Capacity of the YDP. <br />Plan A-7. Pre-pay Future Electrical Capacity <br />Charges. <br />Plan A-B. Install Solar Pond Power Generation to <br />Beneficially Use the Reject Stream. (With <br />reject stream replacement.1 <br />Plan A-SA. Install Solar Pond Generation to <br />Beneficially Use the Reject Stream. (Without <br />reject stream replacement.) <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />v <br /> <br />I <br /> <br />i <br />i <br />i <br />ii <br />iii <br />iii <br /> <br />1 <br />1 <br />1 <br />1 <br />1 <br />3 <br /> <br />5 <br /> <br />5 <br />6 <br />7 <br />8 <br />10 <br /> <br />12 <br />12 <br /> <br />12 <br /> <br />14 <br />14 <br /> <br />15 <br /> <br />15 <br />16 <br />17 <br /> <br />17 <br /> <br />17 <br /> <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.