My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07941
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07941
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:30 PM
Creation date
10/12/2006 2:41:26 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8113.600
Description
Arkansas River Basin Interstate Committee - ARBIC
Basin
Arkansas
Water Division
2
Date
4/2/1985
Title
Statement of the Arkansas River Basin Interstate Committee -- Relative to Appropriations for the Comprehensive Development of the Arkansas River Basin for Fiscal Year 1986
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />KANSAS INTERSTATE COMMITTEE RECOMMENDATIONS <br />FISCAL YEAR 1986 <br />ARKANSAS RIVER BASIN IN KANSAS <br /> <br /> PRES. REQUESTED <br /> CATEGORY BUDGET FUNDING <br /> NAME OF SURVEY OR PROJECT IN KANSAS ** ($1,000) ($1,000) PURPOSE OF REQUEST <br /> Arkansas-Red River Basins ( S) 0 250 Complete reconnaissance phase <br /> Solar Energy Investigations of study on Red River portion <br /> OK, TX, & KS <br />. Verdigris River, KS & OK (FOP) ( S) 70 70 Complete study <br />Arkansas River, Great Bend, KS, to ( S) 0 170 Resume stUdy <br /> John Martin Dam, C 0 (FOP) <br /> Verdigris River, KS & OK Caney River (FOP) ( S) 0 0 Will complete with available funds <br /> El Dorado Lake, KS (FC) ( C) 0 0 Fully funded <br /> Grand (Neosho) River, KS & OK (FOP) ( S) 276 376 Continue study <br /> Halstead Local Flood Protection ( FC) 0 2,000 Authorize project and initiate <br /> Project (FOP) construction <br /> Great Bend Local Flood Protection ( S) 0 0 Fully funded <br /> Project (FC) <br />. Verdigris River, KS & OK, Mingo (SPE) 500 900 Complete study <br />Creek (FOP) <br /> Douglass Lake, KS (FC) P 250 400 Continue planning <br /> Arkansas Riv & Tribs, Great Bend, (FOP) 533 533 No additional requirement <br /> KS ,to Tul sa, OK <br /> Winfield, KS (FOP) 200 200 No additional requirement <br /> Upper Little Araksas River OOC745 (FOP) 0 400 Continue study <br />.... Watershed, KS <br />'" <br />. S - Surveys C - Construction FOP - Flood Damage Prevention <br /> FC - Flood Control SPE - Continuation of Planning S - Study <br /> P - Planning Engineering Studies <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.