My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07913
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07913
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:24 PM
Creation date
10/12/2006 2:40:15 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8277.400.200
Description
Lower Virgin River Project
State
NV
Basin
Colorado Mainstem
Date
11/1/1986
Title
Study of Saline Water Use at the Harry Allen Generating Station - Final Report - November 1986
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />"j" <br /> <br />to <br />'t:l" <br />N <br />o <br />o <br /> <br />. <br /> <br />One 10,000,000 gallon membrane lined surge pond with three 1,000 <br />ga lion pumps <br /> <br />. <br /> <br />Four 450 gpm vapor compression evaporators with deaerators, chemical <br />storage and feed systems, control room and product storage <br /> <br />-:'j <br />, , <br /> <br /> <br />. 64 acres of membrane lined evaporation ponds with 15 foot depth <br /> <br />Option IV eSE) - MakAllp Softening/VCE/Evaporation Pond~ <br /> <br />The battery I imlts for the makeup softening system include the raw water Inlet <br />to the softeners, the inlet to the cooling tower basins and the inlet to the <br />evaporation ponds. The wastewater treatment boundaries includes the Inlet to <br />the surge pond, the makeup to the condensate system and the evaporation ponds. <br />Water system equipment for the Option IV cost estimate Includes: <br /> <br />. Two 9,000 gpm capacity softeners with chemical storage and feed <br />systems <br /> <br />. One 5,500,000 gallon concrete I ined collection basin with three <br />9,000 gpm pumps <br /> <br />. One 10,000,000 gallon membrane lined surge pond with three 900 gpm <br />pumps <br /> <br />. Three 525 gpm vapor compression evaporators with deaerators, chemi- <br />cal storage and feed systems, control room and product storage <br /> <br />. 33 acres of membrane lined evaporation ponds with 15 foot depth <br /> <br />Option V eSE) - Makeup SoftAnlng/Recycle Soften I ng/VCF/Evaporat ion Ponds <br /> <br />The battery limits for the makeup softening system Include the raw water Inlet <br />to the softeners, the inlet to the cooling tower basins and the Inlet to the <br />evaporation ponds. The recycle softening system battery limits Include the <br />cooling tower blowdown outlets and the inlets the ash, FGD and evaporation <br />pond systems. The wastewater treatment boundaries includes the Inlet to the <br />surge pond, the makeup to the condensate system and the evaporation ponds. <br />Water system equipment for the Option V cost estimate Includes: <br /> <br /> <br />. Two 9,000 gpm capacity makeup softeners with chemical storage and <br />feed systems <br />. One 5,500,000 gal Ion concrete lined collection basin with three <br />6,000 gpm pumps <br /> <br />. One 8,000,000 gallon membrane lined collection basin with three 800 <br />gpm pumps <br /> <br />. Two 700 gpm capacity softeners with chemical storage and feed sys- <br />tems <br /> <br />5-3 <br /> <br />~. .' '. <br /> <br />':: <br /> <br />.;. , <br />::i% <br />.',.i;; <br />
The URL can be used to link to this page
Your browser does not support the video tag.